1. Home
  2. Tag "RTC Power"

GUVNL Issue Tender for Supply of 500 MW RTC power for the period from 11th July 2022 to 31st December 2022 on Short Term basis through Tariff Based Competitive bidding Process – EQ Mag Pro

GUVNL Issue Tender for Supply of 500 MW RTC power for the period from 11th July 2022 to 31st December 2022 on Short Term basis through Tariff Based Competitive bidding Process. For more information please see below link:

WBSEDCL issue Tender for Contractor for DEPSICTC including warrantee obligation, O&M for 12 years of a 100 MW (AC) Solar PV Power Plant and 25 MW / 100 MWh BESS – EQ

Petition for floated for procurement of 750 MW RTC power on short term basis through tariff based competitive bidding process – EQ Mag Pro

Petition for floated for procurement of 750 MW RTC power on short term basis through tariff based competitive bidding process. For more information please see below link:

Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and determination of the transmission tariff with Tehri Transmission System in the Northern Region – EQ

To approve procurement of RTC power upto 1000 MW for the period from 01.03.2022 to 31.03.2022 and to float Tender for the procurement RTC power up to 1000 MW for the supply from 01.03.2022 to 31.03.2022 through e-Bidding portal (DEEP) – EQ Mag Pro

To approve procurement of RTC power upto 1000 MW for the period from 01.03.2022 to 31.03.2022 and to float Tender for the procurement RTC power up to 1000 MW for the supply from 01.03.2022 to 31.03.2022 through e-Bidding portal (DEEP). For more information please see below link:

Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and determination of the transmission tariff with Tehri Transmission System in the Northern Region – EQ

Approval for the Short Term Power Purchase of 50 MW RTC Power

Petition for approval of STPPA for securing of power to cater to the demand of Dahej SEZ & Dholera SIR license area under the provisions of the Guidelines for power procurement by Distribution licensee issued by the Commission under Section 86 (1) (b) of the Electricity Act, 2003.  For more information please see below link:

Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and determination of the transmission tariff with Tehri Transmission System in the Northern Region – EQ