Sanction for the “Scheme for Setting-up of 2500 MW ISTS-connected Wind-Solar Hybrid Power Projects” May 26, 2018 Anand Gupta 000109 Featured Sanction for the “Scheme for Setting-up of 2500 MW ISTS-connected Wind-Solar Hybrid Power Projects”. For more information please see below link: Source: mnre.gov.in Read more Amendments in the Supplementary Guidelines for payment of compensation in regard to Right of Way (ROW) for transmission lines issued by MoP on 21.03.2025 – EQ