1. Home
  2. Tag "SECI"

SECI – A Historic Milestone for India’s National Green Hydrogen Mission – EQ

In a landmark development under the National Green Hydrogen Mission, the first-ever auction conducted by SECI for the procurement of Green Ammonia under the SIGHT Scheme (Mode-2A) has achieved a record low price discovery of ₹55.75/kg. This pioneering auction covers the supply of 75,000 metric tonnes per annum of Green Ammonia to Paradeep Phosphates Limited, […]

POWER DEMAND AND GENERATION CAPACITY – EQ

JSW Neo Secures 25-Year Deal with SECI for 230 MW Dispatchable Green Power – EQ

In Short : JSW Neo Energy, a JSW Energy subsidiary, signed a 25-year PPA with SECI under the FDRE Tranche IV scheme to supply 230 MW of firm, dispatchable renewable power at ₹4.98/kWh. This milestone strengthens JSW’s clean energy portfolio, boosting its under-construction capacity to 12.9 GW and aligning with its 2030 target of 30 GW generation capacity. […]

Jupiter International Strengthens Manufacturing Base with New Solar Cell Facility, Doubling Output – EQ

Vena Energy Pioneers India’s First Dispatchable Renewable Power Deal with SECI – EQ

In Short : Vena Energy has signed India’s first 100 MW load-following power purchase agreement (PPA) with SECI under the FDRE scheme. The 25-year agreement ensures dispatchable renewable power aligned with hourly DISCOM demand. The project will combine solar, wind, and battery storage, marking a major step toward reliable, demand-driven clean energy and strengthening India’s […]

Jupiter International Strengthens Manufacturing Base with New Solar Cell Facility, Doubling Output – EQ

Pre-bid meeting: O&M contract including Insurance for 5 Years of 10 MW GMSP Project at Badi Sid, Rajasthan – EQ

Pre-bid meeting: Operation & Maintenance contract including Insurance for 05 (Five) Years of 10 MW Ground Mounted Solar Power Project at Badi Sid, Rajasthan. Pre-bid meeting for the tender has been scheduled as per following details: Date & Time: 22.07.2025 at 11:00 AM (IST). Mode of meeting: Online mode Pre-bid meeting link: https://teams.microsoft.com/l/meetup-join/19%3aXTet8N6xkE_6eHvy05IhHjREk102bgbYd2exX2o-3pU1%40thread.tacv2/1752643586638?context=%7b%22Tid%22%3a%22a24b3e19-3a1f-4c61-9f1e-cace38462ab7%22%2c%22Oid%22%3a%225164b124-35cd-46f3-97d9-6f9cc331e98c%22%7d If you […]

POWER DEMAND AND GENERATION CAPACITY – EQ