Summary: — ### Key Business Points for Bidders #### 1. Tendering Process and Structure – **Procedure:** Single Stage Two Envelope Bidding. – **Envelope-1 (Techno-Commercial Bid):** Contains all eligibility documents, bid fee/EMD, technical proposal, and undertakings. This is uploaded online, with some original documents (like EMD) sent via hard copy. – **Envelope-2 (Price Bid):** Contains the […]
Summary: — #### 1. Project Overview The tender comprises two distinct work packages: 1. **Solar Pumping:** Setting up solar submersible pump sets in peripheral villages and laying pipelines to provide water points. 2. **Sanitation:** Providing Community Toilets in five peripheral villages under the “Swachha Bharat Mission”. #### 2. Key Financials & Costs – **Tender Fee:** […]
Summary: —- **Project Structure:** – **Scheme:** The project is to be developed under the Viability Gap Funding (VGF) scheme through the PSDF (Power Sector Development Fund). – **Model:** The projects will be executed on a BOOT (Build, Own, Operate, and Transfer) basis. – **Packages:** The total capacity is divided into three separate packages, each with […]
Summary: —- **1. Business Opportunity Overview** The Tripura State Electricity Corporation Limited (TSECL) is seeking Expressions of Interest (EOI) from qualified developers and manufacturers to set up a large-scale, distributed Battery Energy Storage System (BESS). This project represents a strategic infrastructure investment aimed at modernizing Tripura’s power grid to handle future demand and integrate renewable […]
Summary: —- #### **Key Details:** – **Issuing Authority:** NTPC Green Energy Limited (NGEL). – **Project Location:** Green Hydrogen Hub, Pudimadaka (near Visakhapatnam), Andhra Pradesh. – **RfP Reference:** NGEL/RE-CS/RfP/Pudimadaka/01. – **Objective:** To select one developer each for Green Ammonia (Parcel A) and Green Methanol (Parcel M). #### **Project Structure & Scope:** NGEL is developing a large-scale […]
Summary: — ### Key Business & Project Details **1. Project Overview & Scope** * **Objective:** Selection of a Solar Power Developer (SPD) to set up a 10 MW Grid-connected Solar PV Power Project with a 10 MW/20 MWh Battery Energy Storage System (BESS) in Odisha. * **Model:** Build, Own, Operate (BOO). * **Buying Entity:** GRIDCO […]
Stakeholder Consultation Meeting: Balance of System tender for setting up of grid connected 700 MW (350 MW * 2) Ground mounted Solar PV plant at Radhanesda, Gujarat A stakeholder’s consultation meeting is being organized in online mode on Friday, 27.02.2026 at 11:00 hrs. The purpose of the meeting is to have discussion and clarification of […]
Summary: —- **1. Case Overview** – **Petitioner:** SJVN Limited (Designated as Intermediary Procurer/Renewable Energy Implementing Agency by MNRE) – **Purpose:** Petition under Section 63 of the Electricity Act, 2003 for adoption of tariff discovered through competitive bidding for 600 MW ISTS-connected Wind Power Projects (Wind-2). – **Respondents:** M/s NLC India Limited (Successful Bidder) and M/s […]
Summary: — ### **1. Project Overview** * **Objective:** Select SPDs to finance, design, install, own, operate, and maintain rooftop solar plants. The SPD will sell the generated solar power to the client organization under a long-term Power Purchase Agreement (PPA). * **Total Capacity:** ~5,665 kW, split across 14 projects at different client sites (e.g., Sushma […]