1. Home
  2. Tag "Setting up of 150 MW (50 MW x 3) Grid Connected Floating Solar Power Projects at Rihand Dam"

Setting up of 150 MW (50 MW x 3) Grid Connected Floating Solar Power Projects at Rihand Dam

Work Description Selection of Solar Power Developers for Setting up of 150 MW (50 MW x 3) Grid Connected Floating Solar Power Projects to be installed at Rihand Dam, Sonbhadra District, Uttar Pradesh under Global Competitive Bidding Tender Value in Rs.: 600 Crore For more information please see below link:

SJVN Ltd issue Tender for RfS Document for Selection of PSP Developers for Setting up of 2000 MW ESC from PSPP in India under Tariff-based Competitive Bidding – EQ