Fixation of normative O&M charges to be paid by the Small Hydro Power Project(s) (upto 25 MW) and other RE generators connected at Substations owned by the Distribution Licensee – EQ November 6, 2023 Anand Gupta 000 Policy & Regulation Fixation of normative O&M charges to be paid by the Small Hydro Power Project(s) (upto 25 MW) and other RE generators connected at Substations owned by the Distribution Licensee. For more information please see below link: Read more Petition of the CERC (Connectivity and General Network Access to inter- State Transmission System) Regulations of 500 MW installed capacity Hybrid Renewable Energy Project – EQ