Petition for execution of the Transmission System for Evacuation of power from potential Solar and Wind Energy Zones in Gujarat (13.5GW) and Madhya Pradesh (4GW) – EQ Mag Pro November 9, 2021 Anand Gupta 000 Policy & Regulation Petition for execution of the Transmission System for Evacuation of power from potential Solar and Wind Energy Zones in Gujarat (13.5GW) and Madhya Pradesh (4GW). For more information please see below link: Read more Petition for the determination of transmission tariff for asset under ‘Transmission Network Expansion in Gujarat to increase ATC from ISTS, Part-B” in the Western Region – EQ