1. Home
  2. Tag "SOLAR POWER PROJECTS"

Petition for Adoption of Tariff for ISTS Grid connected Solar Power Projects of 1200 MW with 600 MW/2400 MWh ESS and with additional capacity with “Greenshoe Option” -EQ

Summary: — ## **1. Nature of Petition** Petition filed under **Section 63 of the Electricity Act, 2003** seeking: 🔹 **Adoption of tariff** for **1200 MW ISTS-connected Solar Power Projects** 🔹 With **600 MW / 2400 MWh Energy Storage System (ESS)** 🔹 Plus **additional 1200 MW under the “Greenshoe Option”** 🔹 Projects selected through competitive bidding […]

Petition with CERC (Procedure, Terms and Conditions for grant of Transmission Licence and other related matters) Regulations to Mandsaur I RE Transmission Limited – EQ

Petition for Adoption of Tariff for ISTS Grid connected Solar Power Projects of 1200 MW with 600 MW/2400 MWh ESS and with additional capacity – EQ

Summary: — ## ⚖️ **Case Summary – CERC Petition No. 773/AT/2025** * **Authority:** Central Electricity Regulatory Commission (CERC), New Delhi * **Date of Hearing:** 26 September 2025 * **Coram:** * Shri Jishnu Barua – Chairperson * Shri Ramesh Babu V. – Member * Shri Harish Dudani – Member * Shri Ravinder Singh Dhillon – Member […]

Petition with CERC (Procedure, Terms and Conditions for grant of Transmission Licence and other related matters) Regulations to Mandsaur I RE Transmission Limited – EQ

Petition for Adoption of tariff for the ISTS Grid Connected Solar Power Projects of 1200 MW with Greenshoe – EQ

Summary: — ## 📌 Case Overview * **Petitioner:** NHPC Limited * **Respondents:** Teerth Gopicon Ltd. & Ors. * **Subject:** Petition under Section 63 of the Electricity Act, 2003 for **adoption of tariff** for **1200 MW ISTS-connected solar projects**, with additional capacity of **up to 1200 MW under Greenshoe Option**. * **Date of Hearing:** 5th August […]

Petition with CERC (Procedure, Terms and Conditions for grant of Transmission Licence and other related matters) Regulations to Mandsaur I RE Transmission Limited – EQ

SJVN Ltd issue Tender for Setting up of 2.4 MW Grid connected Rooftop Solar Power Projects of Arunachal Pradesh under RESCO/PPA mode – EQ

Summary: — ## 📌 Case Overview * **Authority:** Military Engineer Services (MES) * **Tender Inviting Officer:** Garrison Engineer (East), Ranchi * **Work Title:** Provision of **50 kW Rooftop Solar Plant** at “Building No. P-6”, Ranchi * **Estimated Cost:** ₹39.80 lakhs (approx.) * **Completion Period:** 180 days * **Tender Document Cost:** ₹1,000/- (to be paid online) […]

SJVN Ltd issue Tender for RfS Document for Selection of PSP Developers for Setting up of 2000 MW ESC from PSPP in India under Tariff-based Competitive Bidding – EQ

Petition for Adoption of tariff for the ISTS Grid Connected Solar Power Projects of 1200 MW with Greenshoe Option selected through Competitive Bidding Process – EQ

Petition for Adoption of tariff for the ISTS Grid Connected Solar Power Projects of 1200 MW with Greenshoe Option selected through Competitive Bidding Process For more information please see below link:

Petition with CERC (Procedure, Terms and Conditions for grant of Transmission Licence and other related matters) Regulations to Mandsaur I RE Transmission Limited – EQ

SJVN issue Tender for RfS for Selection of SRPD for Setting up of 2.4 MW Grid connected Rooftop Solar Power Projects over the state of AP under RESCO/PPA mode through Tariff-Based Competitive Bidding PMSGMBY – EQ

SJVN issue Tender for RfS for Selection of SRPD for Setting up of 2.4 MW Grid connected Rooftop Solar Power Projects over the state of AP under RESCO/PPA mode through Tariff-Based Competitive Bidding PMSGMBY For more information please see below link:

SJVN Ltd issue Tender for RfS Document for Selection of PSP Developers for Setting up of 2000 MW ESC from PSPP in India under Tariff-based Competitive Bidding – EQ

From Coal to Kilowatts: Transforming Mines into Solar Power Hubs – EQ

In Short : Coal mines are emerging as potential sites for solar power projects, aiding the energy transition. Their vast, unused land and existing infrastructure make them ideal for renewable installations. Repurposing these sites can boost clean energy generation, create local jobs, and transform former fossil fuel hubs into sustainable power centers, supporting a greener […]

Notice regarding Delay in Installation of SCADA based remote control system at IAF airfields – EQ

Petition for Adoption of tariff for the ISTS Grid connected Solar Power Projects of 1200 MW with Energy Storage System by Ministry of Power, Government of India – EQ

Petition for Adoption of tariff for the ISTS Grid connected Solar Power Projects of 1200 MW with Energy Storage System by Ministry of Power, Government of India For more information please see below link:

Petition with CERC (Procedure, Terms and Conditions for grant of Transmission Licence and other related matters) Regulations to Mandsaur I RE Transmission Limited – EQ

Waaree Renewable secures ₹114 crore solar project in Maharashtra – EQ

In Short : Waaree Renewable Technologies Limited (WRTL) has secured a ₹114.23 crore contract to develop 94 MW AC solar power projects in Maharashtra under the Mukhyamantri Saur Krushi Vahini Yojana 2.0. The initiative aims to provide daytime electricity to farmers through decentralized solar generation. WRTL will oversee engineering, procurement, construction, and maintenance, with project […]

Adani Green Implements UN-Backed TNFD Framework for Biodiversity Disclosure – EQ

India allows extension for commissioning of certain solar power projects until December – EQ

In Short : India has extended the commissioning deadline for select solar power projects until December. The decision, aimed at aiding developers facing delays from supply chain and logistical challenges, applies to projects under specific government schemes. This move helps prevent penalties and supports timely project completion amid ongoing disruptions. Official guidelines detail eligibility and […]

House Panel Stresses Greater State Participation to Boost PM Surya Ghar Scheme – EQ