1. Home
  2. Tag "SOLAR PV MODULE"

Module Capacity Vis-à-Vis Flash Tester Measurement Uncertainty – Amitabh Verma – EQ

Introduction Solar PV module is the biggest cost component of the PV plant capex. Depending on the module cost its percentage varies 50-55% of total plant capex. The module is priced as Rs./Wp or $/Wp. It is, therefore, important for the buyers to ensure that they get the exact wattage that they have paid for. […]

India’s renewable energy targets on track, needs to become people’s cause: Minister Pralhad Joshi – EQ

EESL Issue Tender for Supply of 28.723 MWp polycrystalline solar PV module for the State of Maharashtra – EQ Mag

EESL Issue Tender for Supply of 28.723 MWp polycrystalline solar PV module for the State of Maharashtra For more information please see below link:

Ministry of Railways Issue Tender for Supply of 1.94 MW ON Grid Solar System in all remaining Railway stations, Service Building, Residential Quarters and Level crossings under Phase – II over Lucknow – EQ

Results: RfS for Selection of Solar PV Module Manufacturers for Setting up Manufacturing Capacities for High Efficiency Solar PV Modules in India – EQ Mag

Results: RfS for Selection of Solar PV Module Manufacturers for Setting up Manufacturing Capacities for High Efficiency Solar PV Modules in India. For more information please see below link:

India’s renewable energy targets on track, needs to become people’s cause: Minister Pralhad Joshi – EQ

Indian Institute of Technology, Kharagpur Issue Tender for Supply of Solar PV Module of 275 Wp 60 cells Polycrystalline in existing solar plant installed at RK hall IIT Kharagpur – EQ Mag

Indian Institute of Technology, Kharagpur Issue Tender for Supply of Solar PV Module of 275 Wp 60 cells Polycrystalline in existing solar plant installed at RK hall IIT Kharagpur. For more information please see below link:

Ministry of Railways Issue Tender for Supply of 1.94 MW ON Grid Solar System in all remaining Railway stations, Service Building, Residential Quarters and Level crossings under Phase – II over Lucknow – EQ

SECI Issue Tender for RfS for Selection of Solar PV Module Manufacturers for Setting up 10 GW Manufacturing Capacities for High Efficiency Solar PV Modules in India – EQ Mag

Request for Selection (RfS) document for Selection of Solar PV Module Manufacturers for Setting up Manufacturing Capacities for High Efficiency Solar PV Modules in India under the Production Linked Incentive Scheme (Tranche-II) has been issued under the “Scheme Guidelines for Implementation of the Production Linked Incentive Scheme (Tranche II) under ‘National Programme on High Efficiency […]

Ministry of Railways Issue Tender for Supply of 1.94 MW ON Grid Solar System in all remaining Railway stations, Service Building, Residential Quarters and Level crossings under Phase – II over Lucknow – EQ

NTPC Issue Tender for Supply of Solar PV Module for 325 MW Solar Project(s) in Shajapur Solar Park, Madhya-Pradesh – EQ Mag

NTPC Issue Tender for Supply of Solar PV Module for 325 MW Solar Project(s) in Shajapur Solar Park, Madhya-Pradesh. For more information please see below link:

Ministry of Railways Issue Tender for Supply of 1.94 MW ON Grid Solar System in all remaining Railway stations, Service Building, Residential Quarters and Level crossings under Phase – II over Lucknow – EQ

KPCL Issue Tender for supply of 500Wp or above capacity Solar PV modules in place of defective solar modules including replacement for a total capacity of 200kW at 5MW Solar PV Plant, Shivanasamudram, Mandya Dist – EQ Mag Pro

KPCL Issue Tender for supply of 500Wp or above capacity Solar PV modules in place of defective solar modules including replacement for a total capacity of 200kW at 5MW Solar PV Plant, Shivanasamudram, Mandya Dist. For more information please see below link:

Ministry of Railways Issue Tender for Supply of 1.94 MW ON Grid Solar System in all remaining Railway stations, Service Building, Residential Quarters and Level crossings under Phase – II over Lucknow – EQ