Summary: — ## **1. Background and Trigger for the OM** MNRE received a letter from AISIA dated **31 August 2025**, raising alarms about excessive capacity creation in solar PV module manufacturing in India. AISIA pointed out: * Domestic **module manufacturing capacity is nearly 4× India’s annual demand**. * Continued lending for new standalone module and […]
Summary: — ### **1. Purpose of the Draft Order** * MNRE aims to update the minimum efficiency requirements for Solar PV modules listed under ALMM List-I. * The update ensures the list reflects **modern, high-efficiency, commercially viable technologies**. * It is intended to act as a **quality filter**, eliminating outdated and low-efficiency modules from the […]
Mumbai – Saatvik Green Energy Limited, one of India’s leading integrated solar-energy solutions providers, announced that its material subsidiary, Saatvik Solar Industries Private Limited, has received and accepted new orders aggregating to Rs 177.50 crores for the supply of high-efficiency solar photovoltaic (PV) modules. These orders have been awarded by reputed Independent Power Producers (IPPs) […]
Summary: — ### **Document Title:** **Results — Tender for Manufacturing, Testing, Packing, Forwarding, Supply and Transportation of 260 MWp Domestically Manufactured Solar PV Modules with Domestically Manufactured Solar Cells** — ### **Issuing Authority:** **Solar Energy Corporation of India Ltd. (SECI)** **Tender No:** SECI/C&P/OP/11/018/2024-25 — ### **Purpose of the Tender:** The tender was floated for the […]
Pre Bid Clarifications, Amendment 01 and Extension II of Bid submission Deadline: Tender for the Manufacturing, Testing, Packing and Forwarding, Supply and Transportation of 260 MWp Domestically Manufactured Solar PV Modules with Domestically Manufactured Solar Cells. Extension of Bid submission Deadline: Existing Date & Time of Bid Submission: 03.06.2025 till 1400 HRS Existing Date & […]
Circulation of draft Guidelines for series approval of Solar PV Modules for conducting testing in Test Labs for implementation of “Solar Systems, Devices and Components Goods Order, 2025” For more information please see below link: