1. Home
  2. Tag "tariff of Talcher Thermal Power Station"

Petition for determination of tariff of Talcher Thermal Power Station (460MW) for the period from 1.4.2019 to 31.3.2024 NTPC – EQ

Petition for determination of tariff of Talcher Thermal Power Station (460MW) for the period from 1.4.2019 to 31.3.2024 NTPC For more information please see below link:

Petition with CERC (Procedure, Terms and Conditions for grant of Transmission Licence and other related matters) Regulations to Mandsaur I RE Transmission Limited – EQ

Petition for revision of tariff of Talcher Thermal Power Station (460 MW) after the truing up exercise for the period from 1.4.2014 to 31.3.2019. NTPC Ltd – EQ

Petition for revision of tariff of Talcher Thermal Power Station (460 MW) after the truing up exercise for the period from 1.4.2014 to 31.3.2019. NTPC Ltd  For more information please see below link:

Petition with CERC (Procedure, Terms and Conditions for grant of Transmission Licence and other related matters) Regulations to Mandsaur I RE Transmission Limited – EQ