1. Home
  2. Tag "Tata Power Company Limited"

Juniper Green signs PPA with TATA Power Company Limited for 70 MW FDRE Power Project – EQ

Gurugram, Haryana – Juniper Green Energy Limited (“Juniper Green Energy”) today announced that its subsidiary Juniper Green Sigma Eight Private Limited (“Juniper Sigma”) has signed a Power Purchase Agreement with TATA Power Company Limited for a capacity of 70 MW Firm and Dispatchable Renewable Energy (FDRE) power project. The PPA was signed on 23rd September […]

Sineng Electric Supports Commissioning of Tanzania’s First Utility-Scale Grid-Connected Solar Power Station – EQ

Tata Power Company Limited Issue Tender for Supply of 225 MW WIND-SOLAR HYBRID POWER ON LONG TERM BASIS THROUGH COMPETITIVE BIDDING PROCESS – EQ Mag

Tata Power Company Limited Issue Tender for Supply of 225 MW WIND-SOLAR HYBRID POWER ON LONG TERM BASIS THROUGH COMPETITIVE BIDDING PROCESS.     Tender Documents Date and Time of Start of Procurement of Tender Documents 26-Jun-2023 17:00:00 RTZ Corresponding Local Date and Time Not Applicable Date and Time of Closure of Procurement of Tender Documents […]

CSL issue Tender for AMC for Cleaning of Solar Panels on the Roof Top of Various Buildings Shops at Cochin Shipyard Ltd – EQ

Case of Tata Power Company Limited (Distribution) seeking approval for short term Power Purchase through competitive bidding – EQ Mag

Case of Tata Power Company Limited (Distribution) seeking approval for short term Power Purchase through competitive bidding. For more information please see below link:

Petition of the CERC (Conduct of Business) and (Connectivity and General Network Access to the Inter-State Transmission System) (Third Amendment) Regulations – EQ

Case of The Tata Power Company Limited (Generation) for approval of final true-up of ARR for FY 2019-20, FY 2020-21 and FY 2021-22, provisional true-up of ARR for FY 2022-23, and revised ARR and Tariff for FY 2023- 24 and FY 2024-25

Case of The Tata Power Company Limited (Generation) for approval of final true-up of ARR for FY 2019-20, FY 2020-21 and FY 2021-22, provisional true-up of ARR for FY 2022-23, and revised ARR and Tariff for FY 2023- 24 and FY 2024-25 For more information please see below link:

Petition of the CERC (Conduct of Business) and (Connectivity and General Network Access to the Inter-State Transmission System) (Third Amendment) Regulations – EQ

Seeking approval for adoption of Tariff discovered for Long Term Procurement Solar Power from Grid Connected Solar PV Projects of 150 MW capacity through Competitive Bidding Process

  Seeking approval for adoption of Tariff discovered for Long Term Procurement Solar Power from Grid Connected Solar PV Projects of 150 MW capacity through Competitive Bidding Process For more information please see below link:

Petition of the CERC (Conduct of Business) and (Connectivity and General Network Access to the Inter-State Transmission System) (Third Amendment) Regulations – EQ