1. Home
  2. Tag "Tehri Transmission System"

Petition for Truing up and determination of the transmission tariff for Combined Asset under “Transmission System associated Tehri Transmission System” in the Northern Region – EQ

Summary: — ### 1. Overview of the Hearing This document is a “Record of Proceedings” from a CERC hearing involving multiple tariff petitions filed by PGCIL. The primary purpose of these petitions is twofold: 1. **Truing-up (2019-24):** Adjusting the provisional tariff approved for the previous control period based on actual capital expenditure and performance. 2. […]

Petition for extension of date of grid connectivity and commissioning of 7.8 MW Solar Plant for captive use due to occurnance of uncontrollable events – EQ

Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and determination of the transmission tariff with Tehri Transmission System in the Northern Region – EQ

Summary: —- **1. Document Nature & Core Issue:** * This is a consolidated **regulatory proceeding record** from the **Central Electricity Regulatory Commission (CERC)**, covering two related tariff petitions filed by the Power Grid Corporation of India Limited (PGCIL). * **Petitions Involved:** * **Petition No. 602/TT/2025:** For determination of tariff for the **2024-29 period** for Combined […]

Petition for extension of date of grid connectivity and commissioning of 7.8 MW Solar Plant for captive use due to occurnance of uncontrollable events – EQ