Petition for Truing up and determination of transmission tariff for CERC (Conduct of Business) (Terms and Conditions of Tariff) Regulations, 2024 – EQ

Summary: — ## ⚖️ **Document Overview** **Issuing Authority:** Central Electricity Regulatory Commission (CERC), New Delhi **Date of Hearing:** 30 September 2025 **Coram:** * Shri Ramesh Babu V., Member * Shri Harish Dudani, Member **Petitioner:** *Power Grid Corporation of India Limited (PGCIL)* **Respondents:** *Tamil Nadu Generation and Distribution Corporation Limited, Uttar Pradesh Power Corporation Limited,* and […]

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ

Petition of CERC (Terms and Conditions of Tariff) Regulations for recoupment of under-recovered energy charges due to the control of generating station of Chutak Power Station – EQ

Petition of CERC (Terms and Conditions of Tariff) Regulations for recoupment of under-recovered energy charges due to the control of generating station of Chutak Power Station For more information please see below link:

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ

Petition of the CERC (Terms and Conditions of Tariff determination from Renewable Energy Sources) and (Conduct of Business) Regulations Tariff for 50 MW of NTPC Limited – EQ

Petition of the CERC (Terms and Conditions of Tariff determination from Renewable Energy Sources) and (Conduct of Business) Regulations Tariff for 50 MW of NTPC Limited For more information please see below link:

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for the tariff period from 1.4.2024 to 31.3.2029 – EQ

Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for the tariff period from 1.4.2024 to 31.3.2029 For more information please see below link:

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ