Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and determination of the transmission tariff with Tehri Transmission System in the Northern Region – EQ

Summary: —- **1. Document Nature & Core Issue:** * This is a consolidated **regulatory proceeding record** from the **Central Electricity Regulatory Commission (CERC)**, covering two related tariff petitions filed by the Power Grid Corporation of India Limited (PGCIL). * **Petitions Involved:** * **Petition No. 602/TT/2025:** For determination of tariff for the **2024-29 period** for Combined […]

In the matter of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and the determination for “Transmission System for controlling high Short Circuit” in the Southern Region – EQ

In the matter of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and the determination of the transmission tariff for Strengthening Scheme-XXII” in the Northern Region – EQ

Summary: — ## 📌 **Key Details of the Order** ### **1. Case Information** – **Petition No.:** 197/TT/2025 – **Date of Order:** 07.01.2026 – **Petitioner:** Power Grid Corporation of India Limited (PGCIL) – **Respondents:** 15 power distribution utilities/states in Northern Region (UP, Rajasthan, Punjab, Haryana, Delhi discoms, etc.) ### **2. Transmission Asset** – **Asset Name:** Combined […]

In the matter of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and the determination for “Transmission System for controlling high Short Circuit” in the Southern Region – EQ

Petition for Truing up and determination of the transmission tariff for Double Circuit Purnea-Muzaffarpur and Muzaffarpur (PGCIL)-Muzaffarpur (BSEB) Transmission Line, in the Eastern Region and the Northern Region associated with Tala HEP of Powerlinks Transmission Limited – EQ

Summary: —- **KEY POINTS OF PROCEEDINGS:** 1. **Interim Application (IA 97/2025) – Allowed** • Petitioner’s application for amendment of prayers in Petition granted. • Amended petition taken on record; IA disposed of. 2. **Directions to Respondents** • Respondents granted **final opportunity** to file replies within **7 days** (copy to Petitioner). • Petitioner may file rejoinder […]

In the matter of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and the determination for “Transmission System for controlling high Short Circuit” in the Southern Region – EQ

Petition for Truing up and determination of the transmission tariff for “Northern Region System Strengthening Scheme XXXIV” in the Northern Region – EQ

Summary: — ## **Case Overview** This document consolidates proceedings for **nine petitions** filed by **Power Grid Corporation of India Ltd. (PGCIL)** relating to **truing up of transmission tariff (2019–24)** and determination of tariff for the **2024–29 period**. ### **Petition-wise Breakdown** 1. **Petition 481/TT/2025** – Northern Region System Strengthening Scheme XXXIV. 2. **Petition 512/TT/2025** – Northern […]

In the matter of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and the determination for “Transmission System for controlling high Short Circuit” in the Southern Region – EQ

Petition for Truing up and determination of transmission tariff for Transmission System associated with Kishenpur and Moga transmission system in the Northern Region – EQ

Summary: * **Petition No. 482/TT/2019:** This petition is for the revision of the transmission tariff for the periods 2001-04, 2004-09, and 2009-14. It also covers the truing up of the tariff for 2014-19 and the determination of the tariff for 2019-24 for the “Kishenpur-Moga transmission system” in the Northern Region[cite: 4]. * **Petition No. 676/TT/2020:** […]

In the matter of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and the determination for “Transmission System for controlling high Short Circuit” in the Southern Region – EQ

Petition for the determination of transmission tariff from COD of WR-NR Inter Regional Corridor in the Northern Region – EQ

Petition for the determination of transmission tariff from COD of WR-NR Inter Regional Corridor in the Northern Region Summary: — ### **Petition Overview** * **Petitioner**: Power Grid Corporation of India Limited (PGCIL) * **Respondents**: Uttar Pradesh Power Corporation Limited and 15 others * **Subject**: Determination of transmission tariff from **COD to 31 March 2029** for […]

In the matter of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and the determination for “Transmission System for controlling high Short Circuit” in the Southern Region – EQ

Petition for determination of transmission tariff for Evacuation of Power from Solar Energy Zones in the Northern Region – EQ

Petition for determination of transmission tariff for Evacuation of Power from Solar Energy Zones in the Northern Region Summary: — ### **Case Summary** * **Petitioner**: Power Grid Corporation of India Limited (PGCIL) * **Respondents**: Uttar Pradesh Power Corporation Limited and 14 others * **Petition Subject**: Determination of transmission tariff for the period 2024–29 for the […]

In the matter of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and the determination for “Transmission System for controlling high Short Circuit” in the Southern Region – EQ

Petition for Truing up and determination of transmission tariff at Saharanpur (PG) in the Northern Region – EQ

Petition for Truing up and determination of transmission tariff at Saharanpur (PG) in the Northern Region For more information please see below link:

In the matter of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and the determination for “Transmission System for controlling high Short Circuit” in the Southern Region – EQ

Petition for determination of the transmission tariff from COD of state-of-the-art UNMS for the Northern Region ISTS and State Utility Communication Network – EQ

Petition for determination of the transmission tariff from COD of state-of-the-art UNMS for the Northern Region ISTS and State Utility Communication Network For more information please see below link:

In the matter of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and the determination for “Transmission System for controlling high Short Circuit” in the Southern Region – EQ

SJVN Ltd issue Tender for RfS of Solar Rooftop Power Developers for setting up of 2.5 MW Grid connected Rooftop Solar PV Power Without battery storage on Union Government buildings in the Northern Region RESCO mode under PMSGMBY – EQ

SJVN Ltd issue Tender for RfS of Solar Rooftop Power Developers for setting up of 2.5 MW Grid connected Rooftop Solar PV Power Without battery storage on Union Government buildings in the Northern Region RESCO mode under PMSGMBY For more information please see below link:

NGEL issue Tender for Setting up of project(s) in India first Green Hydrogen Hub at Pudimadaka (near Visakhapatnam), Andhra Pradesh – EQ