Petition for Truing up and determination of the transmission tariff for Combined Asset under “Transmission System associated Tehri Transmission System” in the Northern Region – EQ

Summary: — ### 1. Overview of the Hearing This document is a “Record of Proceedings” from a CERC hearing involving multiple tariff petitions filed by PGCIL. The primary purpose of these petitions is twofold: 1. **Truing-up (2019-24):** Adjusting the provisional tariff approved for the previous control period based on actual capital expenditure and performance. 2. […]

Petition for Adoption of the Usage Charges for 1200 MW Solar PV Power Station (Tranche-III) Connected to the ISTS /STU under Central Power Sector undertaking Scheme Phase-II – EQ

Petition for determination of the transmission tariff for Kankroli Sub-station under “Static VAR Compensator (SVCs) in the Northern Region” – EQ

Summary: —- **1. Case Overview** – **Petitioner:** Power Grid Corporation of India Limited (PGCIL) – **Matters Heard:** – **Petition No. 241/TT/2016:** Determination of transmission tariff for the 2014-19 period for the 400/220 kV Kankroli Substation SVC. – **Petition No. 6/TT/2018:** Determination of transmission tariff for the 2014-19 period for the 400/220 kV New Wanpoh Substation […]

Petition for Adoption of the Usage Charges for 1200 MW Solar PV Power Station (Tranche-III) Connected to the ISTS /STU under Central Power Sector undertaking Scheme Phase-II – EQ

Petition for Truing up and determination of the transmission tariff for Assets under “220 kV Srinagar-Leh Transmission System (SLTS)” in the Northern Region – EQ

Summary: —- **1. Case Overview** – **Petitioner:** Power Grid Corporation of India Limited (PGCIL) – **Matters Heard:** Two separate petitions concerning transmission tariff determination for different regional systems. – **Petition No. 744/TT/2025:** Regarding assets under the “220 kV Srinagar-Leh Transmission System (SLTS)” in the Northern Region. – **Petition No. 529/TT/2025:** Regarding the “Chukha Transmission System” […]

Petition for Adoption of the Usage Charges for 1200 MW Solar PV Power Station (Tranche-III) Connected to the ISTS /STU under Central Power Sector undertaking Scheme Phase-II – EQ

Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and determination of the transmission tariff with Tehri Transmission System in the Northern Region – EQ

Summary: —- **1. Document Nature & Core Issue:** * This is a consolidated **regulatory proceeding record** from the **Central Electricity Regulatory Commission (CERC)**, covering two related tariff petitions filed by the Power Grid Corporation of India Limited (PGCIL). * **Petitions Involved:** * **Petition No. 602/TT/2025:** For determination of tariff for the **2024-29 period** for Combined […]

Petition for Adoption of the Usage Charges for 1200 MW Solar PV Power Station (Tranche-III) Connected to the ISTS /STU under Central Power Sector undertaking Scheme Phase-II – EQ

In the matter of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and the determination of the transmission tariff for Strengthening Scheme-XXII” in the Northern Region – EQ

Summary: — ## 📌 **Key Details of the Order** ### **1. Case Information** – **Petition No.:** 197/TT/2025 – **Date of Order:** 07.01.2026 – **Petitioner:** Power Grid Corporation of India Limited (PGCIL) – **Respondents:** 15 power distribution utilities/states in Northern Region (UP, Rajasthan, Punjab, Haryana, Delhi discoms, etc.) ### **2. Transmission Asset** – **Asset Name:** Combined […]

Petition for Adoption of the Usage Charges for 1200 MW Solar PV Power Station (Tranche-III) Connected to the ISTS /STU under Central Power Sector undertaking Scheme Phase-II – EQ

Petition for Truing up and determination of the transmission tariff for Double Circuit Purnea-Muzaffarpur and Muzaffarpur (PGCIL)-Muzaffarpur (BSEB) Transmission Line, in the Eastern Region and the Northern Region associated with Tala HEP of Powerlinks Transmission Limited – EQ

Summary: —- **KEY POINTS OF PROCEEDINGS:** 1. **Interim Application (IA 97/2025) – Allowed** • Petitioner’s application for amendment of prayers in Petition granted. • Amended petition taken on record; IA disposed of. 2. **Directions to Respondents** • Respondents granted **final opportunity** to file replies within **7 days** (copy to Petitioner). • Petitioner may file rejoinder […]

Petition for Adoption of the Usage Charges for 1200 MW Solar PV Power Station (Tranche-III) Connected to the ISTS /STU under Central Power Sector undertaking Scheme Phase-II – EQ

Petition for Truing up and determination of the transmission tariff for “Northern Region System Strengthening Scheme XXXIV” in the Northern Region – EQ

Summary: — ## **Case Overview** This document consolidates proceedings for **nine petitions** filed by **Power Grid Corporation of India Ltd. (PGCIL)** relating to **truing up of transmission tariff (2019–24)** and determination of tariff for the **2024–29 period**. ### **Petition-wise Breakdown** 1. **Petition 481/TT/2025** – Northern Region System Strengthening Scheme XXXIV. 2. **Petition 512/TT/2025** – Northern […]

Petition for Adoption of the Usage Charges for 1200 MW Solar PV Power Station (Tranche-III) Connected to the ISTS /STU under Central Power Sector undertaking Scheme Phase-II – EQ

Petition for Truing up and determination of transmission tariff for Transmission System associated with Kishenpur and Moga transmission system in the Northern Region – EQ

Summary: * **Petition No. 482/TT/2019:** This petition is for the revision of the transmission tariff for the periods 2001-04, 2004-09, and 2009-14. It also covers the truing up of the tariff for 2014-19 and the determination of the tariff for 2019-24 for the “Kishenpur-Moga transmission system” in the Northern Region[cite: 4]. * **Petition No. 676/TT/2020:** […]

Petition for Adoption of the Usage Charges for 1200 MW Solar PV Power Station (Tranche-III) Connected to the ISTS /STU under Central Power Sector undertaking Scheme Phase-II – EQ

Petition for the determination of transmission tariff from COD of WR-NR Inter Regional Corridor in the Northern Region – EQ

Petition for the determination of transmission tariff from COD of WR-NR Inter Regional Corridor in the Northern Region Summary: — ### **Petition Overview** * **Petitioner**: Power Grid Corporation of India Limited (PGCIL) * **Respondents**: Uttar Pradesh Power Corporation Limited and 15 others * **Subject**: Determination of transmission tariff from **COD to 31 March 2029** for […]

Petition for Adoption of the Usage Charges for 1200 MW Solar PV Power Station (Tranche-III) Connected to the ISTS /STU under Central Power Sector undertaking Scheme Phase-II – EQ

Petition for determination of transmission tariff for Evacuation of Power from Solar Energy Zones in the Northern Region – EQ

Petition for determination of transmission tariff for Evacuation of Power from Solar Energy Zones in the Northern Region Summary: — ### **Case Summary** * **Petitioner**: Power Grid Corporation of India Limited (PGCIL) * **Respondents**: Uttar Pradesh Power Corporation Limited and 14 others * **Petition Subject**: Determination of transmission tariff for the period 2024–29 for the […]

Petition for Adoption of the Usage Charges for 1200 MW Solar PV Power Station (Tranche-III) Connected to the ISTS /STU under Central Power Sector undertaking Scheme Phase-II – EQ