Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS of the Ministry of Power, Government of India, as amended from time to time – EQ

Summary: — #### **1. Case Overview** * **Petition Number:** 771/AT/2025 * **Petitioner:** **NTPC Limited** * **Legal Basis:** Filed under **Section 63 of the Electricity Act, 2003**. This section deals with the adoption of tariff discovered through a transparent process of competitive bidding. * **Subject:** The petition seeks the **adoption of tariff** for **1200 MW Wind-Solar […]

In the matter with the CERC (Procedure, Terms and Conditions for grant of trading licence and other related matters) Regulations for EPTPL – EQ

Petition for Adoption of 1200 MW Wind-Solar Hybrid Power Projects with Greenshoe Option of additional capacity to the ISTS for amended from time to time – EQ

Summary: — ## ⚖️ **Case Summary – CERC Petition No. 774/AT/2025** * **Authority:** Central Electricity Regulatory Commission (CERC), New Delhi * **Date of Hearing:** 23 September 2025 * **Coram:** * Shri Jishnu Barua – Chairperson * Shri Ramesh Babu V. – Member * Shri Harish Dudani – Member * Shri Ravinder Singh Dhillon – Member […]

In the matter with the CERC (Procedure, Terms and Conditions for grant of trading licence and other related matters) Regulations for EPTPL – EQ

Petition for the Adoption of tariff of 300 MW Wind Power Projects (Tranche XVIII) connected to the ISTS from time to time – EQ

Summary: — ## ⚖️ **Document Overview** * **Issuing Authority:** Central Electricity Regulatory Commission (CERC), New Delhi * **Document Type:** *Record of Proceedings (RoP)* * **Petition No.:** 758/AT/2025 * **Date of Hearing:** *26 September 2025* * **Coram:** * Shri Jishnu Barua – Chairperson * Shri Ramesh Babu V. – Member * Shri Harish Dudani – Member […]

In the matter with the CERC (Procedure, Terms and Conditions for grant of trading licence and other related matters) Regulations for EPTPL – EQ

Petition for Adoption of tariff for 1.5 GW Solar PV Power Projects connected to the interstate Transmission System and as amended from time to time – EQ

Summary: — ## **Case Overview** * **Petition No.:** 238/AT/2025 * **Filed By:** NTPC Limited * **Respondents:** Apraava Energy Pvt. Ltd. and others * **Subject:** Petition under **Section 63 of the Electricity Act, 2003** for adoption of tariff for **1500 MW Solar PV Power Projects**. * These projects are connected to the **Interstate Transmission System (ISTS)**. […]

In the matter with the CERC (Procedure, Terms and Conditions for grant of trading licence and other related matters) Regulations for EPTPL – EQ

Petition of the CERC (Indian Electricity Grid Code) Regulations, 2010 (amended from time to time) of Jhajjar Power Limited’s – EQ

Petition of the CERC (Indian Electricity Grid Code) Regulations, 2010 (amended from time to time) of Jhajjar Power Limited’s For more information please see below link:

In the matter with the CERC (Procedure, Terms and Conditions for grant of trading licence and other related matters) Regulations for EPTPL – EQ