1. Home
  2. Tag "Torrent Power"

Petition for determination of transmission tariff from COD in respect of two number of assets under “Transmission System associated with DGEN (1200 MW) of Torrent Power Limited” – EQ Mag Pro

Petition for determination of transmission tariff from COD in respect of two number of assets under “Transmission System associated with DGEN (1200 MW) of Torrent Power Limited”. For more information please see below link:

Petition for Adoption of tariff of 1500 MW Solar PV Power Projects Connected to the ISTS of the Ministry of Power, Government of India as amended from time to time – EQ

Torrent Power to acquire 156 MW wind power plants from CESC Ltd – EQ Mag Pro

Torrent Power on Tuesday announced that it has inked a share purchase pact to acquire 156 MW wind power projects for about Rs 790 crore from Surya Vidyut, an arm of CESC Ltd. Surya Vidyut operates 156 MW wind power plants spread across the states of Gujarat, Rajasthan and Madhya Pradesh, a statement said. The […]

IIT Indore Advances Sustainability with Solar Park, New Substation and Cutting-Edge Research Infrastructure – EQ

Torrent Power Limited Has Filed An Application For Grant of Distribution License in the Area of Mandal Becharaji SIR, Villages in the Taluka

Torrent Power Limited Has Filed An Application For Grant of Distribution License in the Area of Mandal Becharaji SIR, Villages in the Taluka. For more information please see below link:

Petition for Adoption of tariff of 1500 MW Solar PV Power Projects Connected to the ISTS of the Ministry of Power, Government of India as amended from time to time – EQ

Torrent Power to Acquire 50 MW Solar Power Plant From Lightsource

“Torrent Power Limited has entered into a Securities Purchase Agreement with Lightsource India Ltd and Lightsource Renewable Energy (India) Ltd for the acquisition of 100 per cent of the share capital and all securities of LREHL Renewables India SPV 1 Private Limited (SPV),” a BSE filing said. New Delhi : Torrent Power said it has […]

IIT Indore Advances Sustainability with Solar Park, New Substation and Cutting-Edge Research Infrastructure – EQ

Petition For Revision of Minimum Quantum of Purchase (in %) From Renewable Energy Sources Percentage Targets for FY 2019 – 20 for Ahmedabad/ Gandhinagar and Surat license areas.

Petition No. 1901 of 2021 filed by Torrent Power Limited under Regulations 4.1 and 4.2 of the GERC (Procurement of Energy from Renewable Sources) Regulations, 2010 for revision of minimum quantum of purchase (in %) from renewable energy sources percentage targets for FY 2019 – 20 for Ahmedabad/ Gandhinagar and Surat license areas. For more […]

Petition for Adoption of tariff of 1500 MW Solar PV Power Projects Connected to the ISTS of the Ministry of Power, Government of India as amended from time to time – EQ

Petition For Revision of Minimum Quantum of Purchase (in %) From Renewable Energy Sources Percentage Targets For FY 2019– 20

Petition No. 1902 of 2021 filed by Torrent Power Ltd. under Regulations 4.1 and 4.2 of the GERC (Procurement of Energy from Renewable Sources) Regulations, 2010 for revision of minimum quantum of purchase (in %) from renewable energy sources percentage targets for FY 2019– 20, for its Dahej License area. For more information please see […]

Petition for Adoption of tariff of 1500 MW Solar PV Power Projects Connected to the ISTS of the Ministry of Power, Government of India as amended from time to time – EQ

Results: Torrent Power Posts Rs 398 Cr Profit in March Quarter

Torrent Power on Thursday posted a consolidated net profit of Rs 398.10 crore in the January-March quarter driven by higher revenues. The company had posted a consolidated net loss of Rs 273.94 crore in the quarter ended on March 31, 2020, a BSE filing said.Total income of the company rose to Rs 3,116.54 crore in […]

IREDA Q3 Results: Net profit zooms 67% to Rs 335 crore – EQ

Torrent Power signs PPA for 300 MW solar power project in Gujarat

Torrent Power has been awarded a long-term Power Purchase Arrangement (PPA) for 300 MW capacity of Solar Power Generation at a tariff of Rs 2.22 per kWh. The project to be set up in Gujarat is estimated to cost Rs 1250 crore and is expected to be commissioned in 18 months from PPA date. Source: […]

NTPC Renewable Arm Commissions 168 MW Solar Capacity, Accelerating India’s Mega Green Power Expansion – EQ