Summary: — ### **Project Specifics** – **Location:** Navinal (Mundra), Gujarat – **Purpose:** Transmission system for providing **connectivity to Renewable Energy (RE) applicants** at Navinal (Mundra) GIS (Gas Insulated Substation) – **Route:** **Regulated Tariff Mechanism (RTM)** – meaning the transmission asset will earn a regulated return on equity and cost-plus tariff, as opposed to competitive bidding […]
Summary: — **Case Background:** The petitioner, **NERGS-I Power Transmission Limited (NREGSPTL)** , filed a petition seeking a transmission license from the Central Electricity Regulatory Commission (CERC). The license was required to develop and operate an Inter-State Transmission System (ISTS) under the “North Eastern Region Generation Scheme-I (NERGS-I)” project. **Key Development & Petitioner’s Position:** During the […]
Summary: — ### 1. Background and Project Details – **Petitioner:** POWERGRID Parli Bidar Transmission Limited (a 100% subsidiary of Power Grid Corporation of India Limited). – **Purpose:** To establish an **Inter-Regional Strengthening between Southern Region (SR) Grid and Western Region (WR) Grid** on a **Build, Own, Operate, and Transfer (BOOT)** basis. – **Transmission Elements:** | […]
Summary: — **1. Parties Involved** – **Petitioner:** TP Gopalpur Transmission Limited (TPGTL) (formerly known as ERES-XXXIX Power Transmission Limited). – **Respondents:** Central Transmission Utility of India Limited (CTUIL) and Others. – **Regulatory Body:** Central Electricity Regulatory Commission (CERC). **2. Background & Procedural History** – The Petitioner had previously filed two similar petitions (**Petition No. 513/TL/2024** […]
Summary: — ### 1. Project Overview The project, titled **”Inter-Regional Strengthening between SR Grid and WR Grid,”** is a critical transmission scheme aimed at enhancing power transfer capability and facilitating the evacuation of renewable energy (RE) from the Southern Region. – **Project Scope (The “Project”):** – **Parli New (WR) – Bidar (SR) 765 kV D/C […]
Summary: —- **1. Overview of the Petition** – **Petition No:** 1029/TL/2025 – **Subject:** Application for the grant of a separate transmission license. – **Petitioner:** Navinal Transmission Limited (NNTL). – **Purpose:** To obtain a transmission license for a system at Navinal (Mundra) (GIS) under the Regulated Tariff Mechanism (RTM) route. This system is intended to provide […]
Summary: —- **Key Procedural Development:** – **Withdrawal Petition:** The Petitioner (NREGSPTL) has now filed an Interlocutory Application (IA) – **IA (Diary) No.34/2026** – seeking permission to **withdraw** the main transmission license petition (No. 322/TL/2024). – **Objective of Withdrawal:** The Petitioner seeks liberty to file a **fresh petition** at a subsequent date. This suggests a need […]