In the matter for the adoption of Transmission Charges with Transmission System being established by POWERGRID Mandsaur Augmentation Transmission Limited – EQ

Summary: — ### Key Business and Regulatory Points #### 1. Core Objective and Legal Framework – **Purpose of the Petition:** The Petitioner sought the adoption of transmission charges for a new ISTS project by the Central Electricity Regulatory Commission (CERC) under **Section 63 of the Electricity Act, 2003**. – **Legal Basis (Section 63):** This section […]

Petition for determination of the transmission tariff from the COD for assets under “Eastern Region Expansion Scheme – XXXVI (ERES-XXXVI)” in the Eastern Region – EQ

Petition with CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulation for Transmission system for Regulated Tariff Mechanism route – EQ

Summary: — ### 1. Case Overview * **Petition No.:** 1029/TL/2025 * **Petitioner:** Navinal Transmission Limited (NNTL) * **Respondents:** Central Transmission Utility of India Limited (CTUIL) & Others. * **Subject:** Application for grant of a separate Transmission License for a transmission system at Navinal (Mundra) (GIS) under the **Regulated Tariff Mechanism (RTM) route**. * **Date of […]

Petition for determination of the transmission tariff from the COD for assets under “Eastern Region Expansion Scheme – XXXVI (ERES-XXXVI)” in the Eastern Region – EQ

Global Invitation for selection of Transmission Service Provider to establish Transmission system for the project namely “Transmission System for Proposed Green Hydrogen / Green Ammonia projects in Vizag area, Andhra Pradesh – EQ

Summary: — ### **1. Project Overview** * **Project Name:** Transmission system for proposed Green Hydrogen / Green Ammonia projects in Vizag area, Andhra Pradesh (Phase-I). * **Objective:** To create a transmission system capable of handling approximately 4,500-5,000 MW of power demand from new Green Hydrogen/Green Ammonia projects and datacenter loads in the Vizag region. * […]

SCHEME TO PROMOTE MANUFACTURING OF ELECTRIC PASSENGER CARS – EQ

Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing-up and determination of transmission tariff for the transmission system constructed – EQ

Summary: — #### 1. Case Overview – **Forum:** Central Electricity Regulatory Commission (CERC), New Delhi. – **Petition No.:** 282/TT/2025 – **Type:** Tariff Petition (Truing-up and Tariff Determination). – **Petitioner:** Adani Transmission (India) Limited (ATIL). – **Respondents:** Power Grid Corporation of India Limited (PGCIL) and Others (including UPPCL). – **Regulatory Framework:** – CERC (Terms and Conditions […]

Petition for determination of the transmission tariff from the COD for assets under “Eastern Region Expansion Scheme – XXXVI (ERES-XXXVI)” in the Eastern Region – EQ

In the matter of Adoption of transmission charges with Transmission System by the POWERGRID Kudankutam Transmission Ltd (a 100% wholly owned subsidiary of Power Grid Corporation of India Ltd) – EQ

Summary: — ### **SUBJECT OF PETITION** – Application under **Section 63 of the Electricity Act, 2003** for **adoption of transmission charges** discovered through competitive bidding for the **Inter-State Transmission System (ISTS)** for evacuation of power from **Kudankulam Unit 3 & 4 (2×1000 MW)** on a **Build, Own, Operate, Transfer (BOOT)** basis. — ### **KEY FINDINGS […]

Petition for determination of the transmission tariff from the COD for assets under “Eastern Region Expansion Scheme – XXXVI (ERES-XXXVI)” in the Eastern Region – EQ

Petition of the Electricity Act for Adoption of transmission charges with Transmission System being established by Mundra I Transmission Limited – EQ

Summary: — ### **Subject of the Petition** MITL filed under **Section 63 of the Electricity Act, 2003**, seeking: 1. **Adoption of transmission charges** discovered through a tariff-based competitive bidding process for a Green Hydrogen/Ammonia transmission project. 2. Inclusion of these charges in the **Point of Connection (POC) pool** under CERC regulations. 3. General prayers for […]

Petition for determination of the transmission tariff from the COD for assets under “Eastern Region Expansion Scheme – XXXVI (ERES-XXXVI)” in the Eastern Region – EQ

Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and determination for the transmission system associated with Tanakpur Transmission System” in the Northern Region – EQ

Summary: —- **1. Case Overview** – **Regulatory Body:** Central Electricity Regulatory Commission (CERC), New Delhi. – **Petitions:** Multiple petitions (572/TT/2025, 592/TT/2025, 575/TT/2025, 508/TT/2025, 511/TT/2025, 605/TT/2025, 579/TT/2025, 513/TT/2025, 514/TT/2025, 904/TT/2025). – **Subject:** Petitions for truing up of transmission tariff for the **2019–24 period** and determination of tariff for the **2024–29 period** for various transmission assets across […]

Petition for determination of the transmission tariff from the COD for assets under “Eastern Region Expansion Scheme – XXXVI (ERES-XXXVI)” in the Eastern Region – EQ

Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for theTransmission System associated with Farakka-I & II in the Eastern Region – EQ

Summary: —- **1. Case Overview** – **Regulatory Body:** Central Electricity Regulatory Commission (CERC), New Delhi. – **Petition Number:** 375/TT/2025. – **Subject:** Petition for truing up of transmission tariff for the 2019–24 period and determination of tariff for the 2024–29 period for the 400 kV Transmission System associated with Farakka-I & II Super Thermal Power Stations […]

Petition for determination of the transmission tariff from the COD for assets under “Eastern Region Expansion Scheme – XXXVI (ERES-XXXVI)” in the Eastern Region – EQ

Petition for Truing up and determination of the transmission tariff for “Transmission System of Vindhyachal-IV & Rihand-III (1000 MW) Generation Project” in the Western Region – EQ

Summary: — **1. Overview of Petitions** All three petitions filed by **Power Grid Corporation of India Limited (PGCIL)** seek: – **Truing up** of transmission tariff for the period **2019–24**. – **Determination** of transmission tariff for the period **2024–29**. **2. Petition-wise Summary** | Petition No. | Scheme / Asset Description | Region | Key Respondents | […]

Petition for determination of the transmission tariff from the COD for assets under “Eastern Region Expansion Scheme – XXXVI (ERES-XXXVI)” in the Eastern Region – EQ

Petition for determination of the tariff for “Transmission System for Kurnool Wind Energy Zone/Solar Energy Zone(AP)” in the Southern Region of the CERC (Conduct of Business) Regulations and (Terms and Conditions of Tariff) Regulations – EQ

Summary: — ### **1. Nature of the Petition** – **Petitioner:** Power Grid Corporation of India Limited (PGCIL) – **Respondents:** Tamil Nadu Power Distribution Corporation Limited (TNPDCL) and Others – **Subject:** Determination of **transmission tariff** for the **2024–29 tariff period** for the project: – **Establishment of 765/400/220 kV Substation at Kurnool-III** – **Extension of 765 kV […]

Petition for determination of the transmission tariff from the COD for assets under “Eastern Region Expansion Scheme – XXXVI (ERES-XXXVI)” in the Eastern Region – EQ