Petition in respect of the transmission assets under “Transmission System for Solar Power Park at Bhadla” in the Northern Region. For more information please see below link:
Petition for adoption of transmission charges with respect to the transmission system being established by POWERGRID Sikar Transmission Limited. For more information please see below link:
Bid process for selection of Transmission Service Provider (TSP) for establishing “Transmission system for evacuation of power from REZ in Rajasthan(20GW) under Phase-III Part H” – Regarding issuance of RfP. For more information please see below link:
Transmission system for evacuation of power from REZ in Rajasthan (20 GW) under phase III –Part A1″ allocated to PFCCL to act as BPC to be implemented through TBCB mode. For more information please see below link:
Power Grid Corporation of India issue Tender for Detailed Survey & Soil Investigation along the transmission Line route for transmission System for evacuation of power from Kaza Solar Power Project (880 MW). For more information please see below link:
Detailed procedure for Grid Connectivity and grant of Open Access for the Transmission System-Comments invited by 20-01-2022. For more information please see below link:
Petition For determination of transmission tariff of the 2019-24 tariff period for two assets under “Transmission system”. For more information please see below link:
Substation Package-SS79 for Extension of 765/400/220kV Bhadla-II PS under Transmission System Strengthening Scheme for Evacuation of Power from Solar Energy Zones in Rajasthan (8.1GW) under Phase-II Part B1(Part-E). For more information please see below link:
Questions around who should own, operate and ultimately benefit from the deployment of energy storage systems could soon be resolved in the Philippines after the government Department of Energy (DoE) issued a set of draft guidelines. In order to accommodate energy storage as an enabler for the modernisation of its electricity networks, the Philippines’ Department […]