Petition for Truing up and determination of transmission tariff of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for DTL – EQ

Summary: —- ### Key Procedural Developments #### 1. **Compliance Status** – The counsel for DTL informed the Commission that the additional information requested by CERC in its previous order (RoP dated 20.11.2025) had been submitted via an affidavit dated January 8, 2026. – DTL also requested permission to file comprehensive **Written Submissions** to consolidate their […]

Petition for the determination of tariff / ATC of the 41 Nos. ISTL / system connecting two states (40 ISTS lines between Telangana and Andhra Pradesh and 1 ISTS line between Telangana and Karnataka) – EQ

Petition for Truing up and determination of transmission tariff of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for SPTL – EQ

Summary: —- ### Key Directives and Information Required from SPTL #### 1. **Compliance and Procedural Directives** – **Amended Petition:** SPTL must file an amended petition aligning with a consequential order dated 29.12.2025 in Petition No. 108/TT/2016, which itself was based on an APTEL judgment dated 25.3.2025. – **Notice to Respondents:** After filing the amended petition, […]

Petition for the determination of tariff / ATC of the 41 Nos. ISTL / system connecting two states (40 ISTS lines between Telangana and Andhra Pradesh and 1 ISTS line between Telangana and Karnataka) – EQ

Petition of the CERC (Terms and Conditions of Tariff) and (Terms and Conditions of Tariff) Regulations for truing-up and determination of tariff of Srinagar PH Line (Deemed ISTS) – EQ

Summary: —- #### 1. Case Background and Legal Context – **Petitioner:** Power Transmission Corporation of Uttarakhand Limited (PTCUL), the state transmission utility. – **Respondents:** Power Grid Corporation of India Limited (PGCIL) and other stakeholders. – **Subject Asset:** The petition concerns the **400 kV Srinagar – Srinagar PH Transmission Line**, which is part of the “UITP […]

Petition for the determination of tariff / ATC of the 41 Nos. ISTL / system connecting two states (40 ISTS lines between Telangana and Andhra Pradesh and 1 ISTS line between Telangana and Karnataka) – EQ

In the matter of the CERC (Conduct of Business) and (Terms and Condition of Tariff) Regulations for truing up and determination for Vindhayachal Pooling- Varanasi Line” under POWERGRID works associated with Inter Regional Corridor – EQ

Summary: —- #### 1. The Dispute and Legal Context – **Petitioner:** NTPC Ltd., India’s largest energy conglomerate. – **Respondents:** A group of 26 electricity distribution companies, including APEPDCL (Andhra Pradesh), MPPMCL (Madhya Pradesh), NBPDCL & SBPDCL (Bihar), and MSEDCL (Maharashtra). – **Legal Basis:** The case is being heard under the CERC (Terms & Conditions of […]

Petition for the determination of tariff / ATC of the 41 Nos. ISTL / system connecting two states (40 ISTS lines between Telangana and Andhra Pradesh and 1 ISTS line between Telangana and Karnataka) – EQ

Petition for Truing up and determination of the transmission tariff for Combined Asset under “Transmission System associated Tehri Transmission System” in the Northern Region – EQ

Summary: — ### 1. Overview of the Hearing This document is a “Record of Proceedings” from a CERC hearing involving multiple tariff petitions filed by PGCIL. The primary purpose of these petitions is twofold: 1. **Truing-up (2019-24):** Adjusting the provisional tariff approved for the previous control period based on actual capital expenditure and performance. 2. […]

Petition for the determination of tariff / ATC of the 41 Nos. ISTL / system connecting two states (40 ISTS lines between Telangana and Andhra Pradesh and 1 ISTS line between Telangana and Karnataka) – EQ

Petition for Truing up and determination of the transmission tariff for Assets under “220 kV Srinagar-Leh Transmission System (SLTS)” in the Northern Region – EQ

Summary: —- **1. Case Overview** – **Petitioner:** Power Grid Corporation of India Limited (PGCIL) – **Matters Heard:** Two separate petitions concerning transmission tariff determination for different regional systems. – **Petition No. 744/TT/2025:** Regarding assets under the “220 kV Srinagar-Leh Transmission System (SLTS)” in the Northern Region. – **Petition No. 529/TT/2025:** Regarding the “Chukha Transmission System” […]

Petition for the determination of tariff / ATC of the 41 Nos. ISTL / system connecting two states (40 ISTS lines between Telangana and Andhra Pradesh and 1 ISTS line between Telangana and Karnataka) – EQ

In the matter of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and the determination for “Transmission System for controlling high Short Circuit” in the Southern Region – EQ

Summary: —- #### Key Details: – **Petitioner:** Power Grid Corporation of India Limited (PGCIL). – **Regulatory Authority:** Central Electricity Regulatory Commission (CERC), New Delhi. – **Date of Order:** 26th February 2026. – **Project Name:** Transmission System for controlling high Short Circuit Current level at 400 kV Thiruvalam S/s (Southern Region). – **Asset Details:** – **Asset-1:** […]

Petition for the determination of tariff / ATC of the 41 Nos. ISTL / system connecting two states (40 ISTS lines between Telangana and Andhra Pradesh and 1 ISTS line between Telangana and Karnataka) – EQ

In the matter of the CERC (Conduct of Business) and (Terms and Condition of Tariff) for truing up and determination of transmission tariff for Baharampur (POWERGRID) – Bheramara (BANGLADESH) in the Eastern Region – EQ

Summary: — ### Detailed Analysis of the CERC Order #### 1. Background and Project Overview – **Petitioner:** Power Grid Corporation of India Limited (PGCIL), the Central Transmission Utility. – **Respondent:** Bangladesh Power Development Board (BPDB), the sole beneficiary of the transmission asset. – **Asset in Question:** 400kV D/C (02nd) Baharampur (POWERGRID) – Bheramara (BANGLADESH) transmission […]

Petition for the determination of tariff / ATC of the 41 Nos. ISTL / system connecting two states (40 ISTS lines between Telangana and Andhra Pradesh and 1 ISTS line between Telangana and Karnataka) – EQ

Petition for Truing up and determination of the transmission tariff for Srinagar-Baramwari line to Khandukhal (Srinagar) Sub-station] under UITP Scheme in the Northern Region – EQ

Summary: —- **Objective:** This is a regulatory proceeding before the CERC where PTCUL is seeking approval for the transmission tariff of a specific 220 kV line. The tariff determines the revenue PTCUL can earn from this asset, which directly impacts its financial health and the transmission charges paid by its customers and other stakeholders. **Key […]

Petition for the determination of tariff / ATC of the 41 Nos. ISTL / system connecting two states (40 ISTS lines between Telangana and Andhra Pradesh and 1 ISTS line between Telangana and Karnataka) – EQ

Petition for Truing up and determination of the transmission tariff for Transmission System associated with Ramagundam STPP including ICT at the Khammam and Reactor at the Gazuwaka under CTP Augmentation – EQ

Summary: — #### Business & Regulatory Summary This document is a Record of Proceedings (RoP) from a regulatory hearing before the CERC. It outlines a tariff dispute and approval process for a major interstate transmission system asset. Key business and regulatory highlights include: – **Core Issue:** PGCIL, the central transmission utility, has filed a petition […]

Petition for the determination of tariff / ATC of the 41 Nos. ISTL / system connecting two states (40 ISTS lines between Telangana and Andhra Pradesh and 1 ISTS line between Telangana and Karnataka) – EQ