In the matter of Approval of CERC (Conduct of Business) Regulations for the truing up and determination of Transmission Tariff for ECEPL and NCC Power Projects Ltd generation projects in Srikakulam Area-Part-C – EQ

Summary: — ## 1. **Project Cost & Investment Approvals** | **Parameter** | **Details** | |————–|————-| | **Original Investment Approval** | 28.03.2013 (BoD 285th Meeting) | | **Original Estimated Cost** | ₹51,420 lakh (including IDC ₹2,879 lakh) – Feb 2013 PL | | **Revised Cost Estimate (RCE)** | 29.03.2017 (BoD 339th Meeting) | | **RCE Estimated […]

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ

Petition for truing up and determination of the transmission tariff for Transmission Line along with extension of Raipur and Rourkela Sub-stations under Eastern-Western inter-regional link” in the Western Region – EQ

Summary: — ### **Subject of the Petition** PGCIL has filed a petition for: 1. **Truing up of transmission tariff** for the **2019–24 tariff period**. 2. **Determination of transmission tariff** for the **2024–29 tariff period**. **Project**: > **Asset-1**: 400 kV Raipur–Rourkela Double Circuit (D/C) Transmission Line, along with extension of Raipur and Rourkela substations under the […]

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ

Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and determination for the transmission system associated with Tanakpur Transmission System” in the Northern Region – EQ

Summary: —- **1. Case Overview** – **Regulatory Body:** Central Electricity Regulatory Commission (CERC), New Delhi. – **Petitions:** Multiple petitions (572/TT/2025, 592/TT/2025, 575/TT/2025, 508/TT/2025, 511/TT/2025, 605/TT/2025, 579/TT/2025, 513/TT/2025, 514/TT/2025, 904/TT/2025). – **Subject:** Petitions for truing up of transmission tariff for the **2019–24 period** and determination of tariff for the **2024–29 period** for various transmission assets across […]

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ

Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and determination of the transmission tariff with Tehri Transmission System in the Northern Region – EQ

Summary: —- **1. Document Nature & Core Issue:** * This is a consolidated **regulatory proceeding record** from the **Central Electricity Regulatory Commission (CERC)**, covering two related tariff petitions filed by the Power Grid Corporation of India Limited (PGCIL). * **Petitions Involved:** * **Petition No. 602/TT/2025:** For determination of tariff for the **2024-29 period** for Combined […]

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ

Petition for Truing up and determination of the transmission tariff for Combined Asset under “Northern Region System Strengthening Scheme-XV” – EQ

Summary: — ### **1. PROCEEDINGS & COMMISSION’S DIRECTIONS** After hearing PGCIL’s representatives, the Commission issued the following procedural directions: **A. Timeline for Submissions:** 1. **Respondents** (State Utilities) to file their **replies within two weeks**, with an advance copy to PGCIL. 2. **PGCIL** may file its **rejoinder within two weeks** thereafter. **B. Specific Information Sought from […]

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ

Petition for Truing up and determination of transmission tariff for the Combined Asset under “Integration of Pooling Stations in Chhattisgarh with Central Part of the Western Region for IPP Generation Projects – EQ

Summary: —- ### **1. Overview and Context:** – **Date of Hearing:** 13th January 2026. – **Common Petitioner:** Power Grid Corporation of India Limited (PGCIL). – **Subject:** Multiple petitions (listed below) for **truing up of tariffs for the 2019-24 period** and **determination of tariffs for the 2024-29 period** for various transmission assets across India. – **Regulatory […]

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ

Petition for Truing up and determination of the transmission tariff for “Transmission System of Vindhyachal-IV & Rihand-III (1000 MW) Generation Project” in the Western Region – EQ

Summary: — **1. Overview of Petitions** All three petitions filed by **Power Grid Corporation of India Limited (PGCIL)** seek: – **Truing up** of transmission tariff for the period **2019–24**. – **Determination** of transmission tariff for the period **2024–29**. **2. Petition-wise Summary** | Petition No. | Scheme / Asset Description | Region | Key Respondents | […]

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ

Petition for Truing up and determination of transmission tariff for “Integration of Pooling Stations with Central Part of the Western Region for IPP Generation Projects in Chhattisgarh” – EQ

v Sumamry: — **1. Regulatory Authority** Central Electricity Regulatory Commission (CERC), New Delhi. **2. Overview of Petitions** A **combined proceeding** covering **11 separate tariff petitions** filed by **Power Grid Corporation of India Limited (PGCIL)** for truing up of transmission tariffs for the period **2019–24** and determination of tariffs for **2024–29**. **3. Common Objective Across All […]

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ

Petition for Truing up and determination of transmission tariff for Bawana – Mandaula Double Ckt. and Bamnauli – Ballabhgarh Double Ckt. transmission lines as CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations – EQ

Summary: — ### **1. Overview & Context** * **Document Type:** CERC Order/Proceeding from a hearing held on **13 January 2026**. * **Core Subject:** Hearing for two interconnected tariff petitions filed by **Delhi Transco Limited (DTL)**, concerning the same set of critical 400 kV transmission lines in the Delhi region. * **Legal Framework:** Petitions filed under […]

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ

In the matter of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for Truing up and determination of transmission tariff for “Combined Asset under System Strengthening XIX scheme” in the Southern Region – EQ

Summary: — #### **1. Subject of the Petition** – **Petitioner:** Power Grid Corporation of India Limited (PGCL). – **Asset:** Combined Asset under **”System Strengthening XIX Scheme”** in the **Southern Region**, comprising: 1. **LILO of existing Kolar–Sriperumbudur 400 kV line at Thiruvalam.** 2. **Kurnool–Thiruvalam 765 kV D/C line** (charged at 400 kV). 3. **Upgradation of Thiruvalam […]

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ