1. Home
  2. Tag "Whole-Station-Level"

Full-Stack Validation: Sineng Electric Passes Whole-Station-Level Grid-Forming Test in China – EQ

Recently, Sineng Electric, in close collaboration with the project owner and Hunan Electric Test Research Institute Co., Ltd. (hereinafter referred to as “Hunan Xiangdian”), successfully completed a full-process grid-forming, grid-following, and off-grid test at the Changsha Ningxiang Guanshan 100MW/200MWh Energy Storage Power Station. The successful completion of the tests signifies that Sineng Electric’s grid-forming energy […]

INCREASING ADOPTION OF ELECTRIC VEHICLES IN INDIA – EQ