Petition for adoption of tariff for the Wind Power Projects (Tranche-XI) connected to the Inter-State Transmission System (ISTS) – EQ Mag February 9, 2023 Anand Gupta 000 Policy & Regulation Petition for adoption of tariff for the Wind Power Projects (Tranche-XI) connected to the Inter-State Transmission System (ISTS). For more information please see below link: Read more DERC (Group Net Metering and Virtual Net Metering for Renewable Energy) (Seventh Amendment) Guidelines, 2025 – EQ