1. Home
  2. Tag "wind power projects"

IMPORTANT: Pre-bid meeting for RfS for 1200 MW Wind Power Projects

IMPORTANT: Pre-bid meeting for RfS for 1200 MW ISTS-connected Wind Power Projects in India (Tranche-X) This has reference to the RfS issued for setting up of 1200 MW ISTS-connected Wind Power Projects in India (Tranche-X). In this regard, it is hereby intimated that the pre-bid meeting has been rescheduled to be held on 11.01.2021, at […]

PROVISION OF NON CONVENTIONAL SOLAR PHOTOVOLTAIC POWER PLANT 150KWP

SECI Issues RFS For Setting up of 1200 MW Wind Power Projects in India 

  Request for Selection (RfS) Document for Selection of Wind Power Developers for Setting up of 1200 MW ISTS-connected Wind Power Projects in India under Tariff-Based Competitive Bidding (Tranche-X) The last date to submit the bids is February 05, 2021 Tender Value in Rs.: 72,00,00,00,000 For more information please see below link:

PROVISION OF NON CONVENTIONAL SOLAR PHOTOVOLTAIC POWER PLANT 150KWP

In the matter of: Petition for adoption of tariff for 550 MW Wind Power Projects connected to the Inter-State Transmission System

In the matter of: Petition under Section 63 of the Electricity Act, 2003 for adoption of tariff for 550 MW Wind Power Projects connected to the Inter-State Transmission System and selected through competitive bidding process as per the Standard Bidding Guidelines issued by Ministry of Power dated 8.12.2017. For more information please see below link:

RERC issues the Regulations for installation of Grid Interactive Distributed RE Generating Systems

In the matter of: Petition for adoption of tariff for 480 MW Wind Power Projects

In the matter of: Petition under Section 63 of the Electricity Act, 2003 for adoption of tariff for 480 MW Wind Power Projects (Tranche-VII) connected to the Inter-State Transmission System and selected through competitive bidding process as per the Standard Bidding Guidelines issued by Ministry of Power dated 8.12.2017. For more information please see below […]

RERC issues the Regulations for installation of Grid Interactive Distributed RE Generating Systems

SECI Issues NIT For 1200 MW Wind Power Projects

NIT FOR SETTING UP OF 1200 MW ISTS-CONNECTED WIND POWER PROJECTS (TRANCHE-IX) UNDER TARIFF-BASED COMPETITIVE BIDDING Notice Inviting Tender SECI hereby intimates its intent for procurement of wind power through a Request for Selection (Rfs) document for setting up of 1200 MW ISTS-connected Wind Power Projects in India, through a global tarif-based competitive bidding process. […]

Hyundai plays catch up in EV market with car that can cook dinner

Petition for adoption of tariff for the Scheme for 480 MW Wind Power Projects (Tranche-VII)

Petition under Section 63 of the Electricity Act, 2003 for adoption of tariff for the Scheme for 480 MW Wind Power Projects (Tranche-VII) connected to the inter-State Transmission System and selected through Competitive Bidding Process as per the Guidelines issued by Ministry of Power on 8.12.2017 For more information please see below link:

RERC issues the Regulations for installation of Grid Interactive Distributed RE Generating Systems

In the matter of: Petition for adoption of tariff for 1200 MW Wind Power Projects (Tranche-V) connected to the Inter-State Transmission System (ISTS)

In the matter of: Petition under Section 63 of the Electricity Act, 2003 for adoption of tariff for 1200 MW Wind Power Projects (Tranche-V) connected to the Inter-State Transmission System (ISTS) and selected through competitive bidding process as per the Guidelines issued by Ministry of Power on 8.12.2017 For more information please see below link:

RERC issues the Regulations for installation of Grid Interactive Distributed RE Generating Systems