Summary: — # ⚖️ Case Details * **Forum:** Gujarat Electricity Regulatory Commission (GERC), Gandhinagar. * **Petition No.:** 2472 of 2025. * **Filed under:** Sections 86(1)(c), (e), (f) of the Electricity Act, 2003 + Regs. 80 & 82 of GERC Conduct of Business Regulations, 2004. * **Subject:** * Extension of time up to **31.12.2025** for construction […]
Petition of the MERC for adoption of tariff for procurement of 13 MW of Wind-Solar Hybrid power for procurement of 2000 MW Wind-Solar Hybrid power For more information please see below link:
Selection of Hybrid Power Generators for supply of 1200 MW Power from ISTS connected Wind-Solar Hybrid Power Projects Anywhere in India For more information please see below link:
IN REGARD TO THE APPLICATION SUBMITTED BY THE CESC LIMITED FOR ADOPTION OF TARIFF AND APPROVAL OF PPA EXECUTED BY AND BETWEEN AMP ENERGY GREEN SEVENTEEN PRIVATE LIMITED AND CESC LIMITED FOR PROCUREMENT OF 150 MW WIND-SOLAR HYBRID POWER. For more information please see below link:
NTPC Limited Issue Tender for Supply of 1.5 GW ISTS-CONNECTED WIND-SOLAR HYBRID POWER PROJECTS ANYWHERE IN INDIA For more information please see below link: Tender Documents Date and Time of Start of Procurement of Tender Documents 24-Jul-2023 11:00:00 RTZ Corresponding Local Date and Time 24-Jul-2023 11:00:00 IST Date and Time of Closure of Procurement […]
Tata Power Company Limited Issue Tender for Supply of 225 MW WIND-SOLAR HYBRID POWER ON LONG TERM BASIS THROUGH COMPETITIVE BIDDING PROCESS. Tender Documents Date and Time of Start of Procurement of Tender Documents 26-Jun-2023 17:00:00 RTZ Corresponding Local Date and Time Not Applicable Date and Time of Closure of Procurement of Tender Documents […]
Petition for seeking adoption of tariff discovered under Competitive Bidding Process for procurement of 255 MW Wind-Solar Hybrid Power from grid connected Wind-Solar Hybrid Power Project. For more information please see below link:
MSEDCL Issue Tender for FOR PROCUREMENT OF 500 MW WIND-SOLAR HYBRID POWER ON LONG TERM BASIS THROUGH COMPETITIVE BIDDING PROCESS. For more information please see below link:
Petition for seeking approval of source as well as approval of the Draft Power Supply Agreement (PSA) for procurement of 800 MW ISTS connected Wind Solar Hybrid Power under Tranche IV scheme of Solar Energy Corporation of India Limited (SECI) at a levellized tariff of Rs. 2.34/kWh for 700 MW and Rs. 2.35/kWh for 100 […]