1. Home
  2. 2022

Petition for seeking permission for extension of the period for submitting proof of release of 10% fund through equity towards execution of 25 MW Solar Power Project located at Jodhpur, Rajasthan – EQ Mag Pro

Petition for seeking permission for extension of the period for submitting proof of release of 10% fund through equity towards execution of 25 MW Solar Power Project located at Jodhpur, Rajasthan. For more information please see below link:

Petition with CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to NERGS-I Power Transmission Ltd – EQ

SJVN wins 105 MW floating solar project in Maharashtra – EQ Mag Pro

NEW DELHI : Satluj Jal Vidyut Nigam (SJVN) on Wednesday announced that it has obtained 105 MW Floating Solar Project through e-Reverse auction held by Maharashtra State Power Generation Company (MAHAGENCO). The company stated that SJVN bagged 105 MW Floating Solar Project @ ₹3.93 per unit on Build Own and Operate basis in tariff based […]

CREST Floats Tender for Development of 3 MW Rooftop Solar Projects Across Chandigarh -EQ

Mondragon Assembly will develop an automated PV manufacturing line for the Indian customer BVG India Ltd. – EQ Mag Pro

This will be one of the most automated and biggest lines in North India with the capability of producing higher wattage modules with bigger cut cells. A new milestone for Mondragon Assembly Solar in India Mondragon Assembly, a specialist turnkey line provider with high technological value and adaptable to any existing need in the solar […]

RSDCL issue Tender for RfS for Selection of SPD for Setting up of 2.5 GW SPVPP with 1.6 MW/6.4 MWh ESS at Pugal Solar Park, Bikaner in the State of Rajasthan and Connected to STU Network – EQ

Blockchain Company Used Kstar Container Solution to Maximize ROI – EQ Mag Pro

A leading #blockchain service company with business coverage in Europe, Asia and America is planning to build dozens of bitcoin #mining farms in two months. However, investing in a traditional warehoused-type mining farm is expensive and time-consuming, and profitability could be affected by rising electricity bills and rents. The company knew they needed a better […]

RSDCL issue Tender for RfS for Selection of SPD for Setting up of 2.5 GW SPVPP with 1.6 MW/6.4 MWh ESS at Pugal Solar Park, Bikaner in the State of Rajasthan and Connected to STU Network – EQ