Petition for seeking permission for extension of the period for submitting proof of release of 10% fund through equity towards execution of 25 MW Solar Power Project located at Jodhpur, Rajasthan – EQ Mag Pro
0
0
Petition for seeking permission for extension of the period for submitting proof of release of 10% fund through equity towards execution of 25 MW Solar Power Project located at Jodhpur, Rajasthan.
For more information please see below link:
Related posts:
- Petition for determination of project specific levelized tariff for 25 MW Floating Solar Photo Voltaic Plant at NTPC Simhadri in Andhra Pradesh – EQ Mag Pro
- Petition for approval of tariff of Kopili Hydro Electric Project Stage-II (25 MW) – EQ Mag Pro
- Petition for truing up of tariff for 1200 MW Dgen Mega Power Project (DGEN Plant) of Torrent Power Limited – EQ Mag Pro
- Petition for seeking extension/ deferment of Scheduled Commissioning Date for 45.6 MW out of the total 240 MW wind power project on account of Force Majeure events – EQ Mag Pro