Featured September 11, 2019 Anand Gupta 0 GENERIC TARIFF ORDER FOR RENEWABLE ENERGY SOURCES FOR FY 2019-2020 0 0 0 00 0 0 more now viewing GENERIC TARIFF ORDER FOR RENEWABLE ENERGY SOURCES FOR FY 2019-2020 September 11, 2019 Anand Gupta now playing 2026 - Guwahati - Global Solar Expo Assam & North East India September 11, 2019 Anand Gupta now playing Petition with CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to KPS III HVDC Transmission Ltd - EQ September 11, 2019 Anand Gupta now playing Petition for the determination of RRVPN-owned transmission lines/system connecting with the other States and inter-State transmission of electricity - EQ September 11, 2019 Anand Gupta now playing Petition for determination of tariff for the new Transmission and Distribution System of Damodar Valley Corporation - EQ September 11, 2019 Anand Gupta now playing Terra Clean Ltd issue Tender for RFQ for E2E Insts Connected 100 MW Wind Energy Project in Gujarat with Comprehensive O&M for 10 Years on LSTK Basis - EQ September 11, 2019 Anand Gupta now playing NHPC Ltd issue Tender for Roof Top Developer for Setting up Grid Connected Solar Roof Top Plants at Various locations on government buildings in the state of Haryana on RESCO Mode - EQ September 11, 2019 Anand Gupta now playing Ranchi Floating Solar Project Set for Commissioning in April - EQ September 11, 2019 Anand Gupta now playing Domestic Power Tariff to Remain Unchanged for FY 2026–27 - EQ September 11, 2019 Anand Gupta now playing IESA Urges Unified Government Action to Bridge 60 GWh Domestic Cell Manufacturing Gap - EQ September 11, 2019 Anand Gupta now playing Grid-Scale Battery Storage and Real-Time Monitoring Key to Boosting Renewable Energy Integration: MNRE Secretary - EQ September 11, 2019 Anand Gupta GENERIC TARIFF ORDER FOR RENEWABLE ENERGY SOURCES FOR FY 2019-2020 For more information please see below link: Related posts: Cabral: govt intends to reduce unit rates for ‘low power’ users JERC Net Metering Regulations for Goa & UT’s Haryana CM Khattar orders probe into ‘Rs 50-cr scam’ in HAREDA Odisha CM launches 22 projects including Rs 150.90 cr Hindalco Solar plant tags: JERC 0 00 0 0 previous EXTENSION OF BID SUBMISSION DEADLINE-II OF 6GW ISTS CONNECTED SOLAR PV POWER PLANTS next In the Matter Of: Power procurement and adoption of tariff for 439.9 MW wind power PSA executed on dt. 13.07.2017 between UPPCL and PTC India Ltd. Anand Gupta Editor - EQ Int'l Media Network Related Posts CCI approves subscription of certain equity share capital of Aditya Birla Renewables (ABReN/Target) by GIP EM Star Ltd. – EQ March 26, 2026 Anand Gupta 0 India Commissions 8,000 TPA Green Hydrogen Capacity till February 2026 – EQ March 26, 2026 Anand Gupta 0 PM Surya Ghar Yojana Drives Energy Transition: 9.56 GW Rooftop Solar Capacity Added till March 2026 – EQ March 26, 2026 Anand Gupta 0 LEAVE YOUR COMMENT Cancel replyYour email address will not be published. Required fields are marked *