Featured December 4, 2019 Anand Gupta 0 RESULTS OF E-BIDDING AND E-RA FOR 1500 MW GRID-CONNECTED SOLAR PV POWER PROJECTS 0 00 0 0 more now viewing RESULTS OF E-BIDDING AND E-RA FOR 1500 MW GRID-CONNECTED SOLAR PV POWER PROJECTS December 4, 2019 Anand Gupta now playing NTPC Ltd issue Tender for Supply of Solar PV Modules for 1.2 GW Solar PV Projects at NTPC Rel Khavda RE Park-South Block in Rann of Kutch Gujarat - EQ December 4, 2019 Anand Gupta now playing NTPC Ltd issue Tender for Supply and Installation of SVG Package for Reactive Power Compensation at Devikot Solar PV Station - EQ December 4, 2019 Anand Gupta now playing CPWD issue Tender for SITC of Grid Connected Rooftop Solar Power Plant at Composite Regional Centre (CRC) Rajnandgaon (C.G.) - EQ December 4, 2019 Anand Gupta now playing How governments can best support consumers during this energy crisis - EQ December 4, 2019 Anand Gupta now playing Avaada Group Surpasses 17.7 GWp Renewable Portfolio; Over 7.2 GWp Operational and ~ 10.5 GWp Under Construction - EQ December 4, 2019 Anand Gupta now playing Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation - EQ December 4, 2019 Anand Gupta now playing Petition of the CERC (Conduction of Business) Regulations for Bihar State Power Holding Company Limited and PTC India Limited - EQ December 4, 2019 Anand Gupta now playing Petition of the CERC (Procedure, Terms and Conditions for Grant of Trading Licence and other Related Matters) Regulations, 2020 - EQ December 4, 2019 Anand Gupta now playing CB issue Tender for Supply and Installation of Solar Power System - EQ December 4, 2019 Anand Gupta now playing PIXON Receives ALMM Approval for 2.391 GW Solar Module Manufacturing Capacity - EQ December 4, 2019 Anand Gupta RESULTS OF E-BIDDING AND E-RA FOR 1500 MW GRID-CONNECTED SOLAR PV POWER PROJECTS UNDER CPSU SCHEME, PHASE-II (TRANCHE-II) /web-data/docs/CPSU%20Ph-II%20Tranche-II%20result%20website%20upload.pdf tags: 1500 MW RESULT 00 0 0 previous LONGi Solar entered into a major deal with Adani Green Energy to supply solar panels in 2020 next RESULTS OF E-BIDDING AND E-RA FOR 1200 MW ISTS-CONNECTED SOLAR PV POWER PROJECTS (ISTS-VI) Anand Gupta Editor - EQ Int'l Media Network Related Posts How governments can best support consumers during this energy crisis – EQ May 8, 2026 Anand Gupta 0 Avaada Group Surpasses 17.7 GWp Renewable Portfolio; Over 7.2 GWp Operational and ~ 10.5 GWp Under Construction – EQ May 8, 2026 Anand Gupta 0 PIXON Receives ALMM Approval for 2.391 GW Solar Module Manufacturing Capacity – EQ May 6, 2026 Anand Gupta 0 LEAVE YOUR COMMENT Cancel replyYour email address will not be published. Required fields are marked *