Featured March 16, 2021 Anand Gupta 0 Monthly Summary for the Cabinet for the month of February, 2021 0 0 0 00 0 0 more now viewing Monthly Summary for the Cabinet for the month of February, 2021 March 16, 2021 Anand Gupta now playing Chhattisgarh State Electricity Supply Code (Fifth Amendment) 2025 - EQ March 16, 2021 Anand Gupta now playing CSER Commission (Conduct of Business) (Second Amendment) Regulations, 2025 - EQ March 16, 2021 Anand Gupta now playing Petition for the determination of transmission tariff for asset under ‘Transmission Network Expansion in Gujarat to increase ATC from ISTS, Part-B” in the Western Region - EQ March 16, 2021 Anand Gupta now playing MPUVNL issue Tender for RfP for setting up of Grid connected Solar PV based Power Plants under Surya Mitra Krishi Feeders Scheme - EQ March 16, 2021 Anand Gupta now playing MES issue Tender for Provision of Roof Top Solar at Certain Bldgs of Arty Centre Under GE Nasik Road Camp - EQ March 16, 2021 Anand Gupta now playing BPCL issue Tender for Removing, Reinstallation of Existing Solar Facilities at DME352 Kota Territory - EQ March 16, 2021 Anand Gupta now playing Tamil Nadu Achieves New Milestone in Solar Power Generation and Grid Absorption - EQ March 16, 2021 Anand Gupta now playing Winter Chill Drives Power Demand Surge as Peak Load Touches 236 GW - EQ March 16, 2021 Anand Gupta now playing Ambala Cantonment Launches Major Project to Strengthen Power Distribution Network - EQ March 16, 2021 Anand Gupta now playing Telangana Deploys Transformer-Level Smart Meters to Reduce Power Subsidy Losses - EQ March 16, 2021 Anand Gupta Monthly Summary for the Cabinet for the month of February, 2021 For more information please see below link: Download [0.98 MB] Related posts: MNRE – Notice MNRE’s 40 GW rooftop solar target “unrealistic”: Parliamentary panel IWPA suggests changes in the CERC – REC Regulations (Third Amendment) Wind Turbine Models included in the RLMM after declaration of new procedure tags: MNRE 0 00 0 0 previous Sonu Sood Installs Solar Panels At Punjab House, Says 'go Solar, Save Electricity' next LONGi Plans to Acquire a 27.25% Stake in CENTER Technology as Part of Its Strategy to Develop BIPV Anand Gupta Editor - EQ Int'l Media Network Related Posts Pre-bid meeting: RfS for Supply of 1000 MW Excess Power from RE Projects having Existing PPA (SECI-FDRE-VIII) – EQ December 27, 2025 Anand Gupta 0 Government Boosts RE Ecosystem with Green Hydrogen, Key Schemes and Strong Monitoring – EQ December 27, 2025 Anand Gupta 0 Empowering Women to be Energy Entrepreneurs Improves Not Only Their Lives but Also Their Communities – EQ December 27, 2025 Anand Gupta 0