Featured August 23, 2021 Anand Gupta 0 Bid eRA Results for SECI Hybrid 4 Tender 0 0 0 00 0 0 more now viewing Bid eRA Results for SECI Hybrid 4 Tender August 23, 2021 Anand Gupta now playing Petition for the determination of transmission tariff for Establishment of Sub-station at Kurnool-III under “Transmission System for Kurnool Wind Energy Zone / Solar Energy Zone (AP)- Part-A & Part-B” in the Southern Region - EQ August 23, 2021 Anand Gupta now playing Petition with CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to NERGS-I Power Transmission Limited - EQ August 23, 2021 Anand Gupta now playing Petition for Adoption of tariff for 2000 MW ISTS Solar PV Power Projects with 1000 MW/ 4000 MWh ESS (SECI-ISTS-XX) of the Government of India - EQ August 23, 2021 Anand Gupta now playing WBSEDCL issue Tender for Selection of Consulting Services for DEPSICTC including warrantee obligation with 5 Yrs, O&M of a 100 MW (AC) Solar PV Power Plant and 52 MWh BESS at Goaltore, Paschim Medinipur, West Bengal - EQ August 23, 2021 Anand Gupta now playing CEL issue Tender for Selection of Bidder for setting up of 1.2 GWp Solar PV Module Manufacturing Line at CEL Sahibabad on revenue sharing model under Make in India Initiative - EQ August 23, 2021 Anand Gupta now playing Gujarat Launches Integrated Renewable Energy Policy 2025 to Boost Green Energy and Grid Stability - EQ August 23, 2021 Anand Gupta now playing CERC Introduces Virtual PPA Framework to Support Renewable Energy Targets - EQ August 23, 2021 Anand Gupta now playing Power Corporation Seeks UPERC Approval to Recover Smart Meter Installation Costs - EQ August 23, 2021 Anand Gupta now playing REMCL Awards 10-Year O&M Contract to POWERCON for Rajasthan Wind Power Project - EQ August 23, 2021 Anand Gupta now playing China and India Lead APAC Manufacturing Expansion as Wind Installations Reach 115.3 GW - EQ August 23, 2021 Anand Gupta Bid eRA Results for SECI Hybrid 4 Tender Related posts: Selection of 750 MW Grid-connected Solar PV Power Projects in Rajasthan (Tranche-I) SECI Floated RFS For 400 MW RTC Supply to NDMC, New Delhi, and Dadra & Nagar Haveli Unconfirmed- List of Bidders for SECI Solar T-VI Bid Results SECI Wind X tags: HYBRID SECI Tender Result 0 00 0 0 previous 2nd Pre Bid Meeting : Selection of Solar Power Developers For Setting Up of 15 MW Grid Connected Floating Solar PV Power Plant At Nangal Pond - EQ Mag Pro next ACWA Power Marks the Inauguration of 300 MW First Stage of Shuaa Energy 3 PSC - EQ Mag Pro Anand Gupta Editor - EQ Int'l Media Network Related Posts Strategies for Resilience – Ensuring Renewable Power Systems’ Readiness to Face Extreme Weather – EQ December 26, 2025 Anand Gupta 0 Opportunities for district heating in the changing energy landscape – EQ December 26, 2025 Anand Gupta 0 Energy employment has surged, but growing skills shortages threaten future momentum – EQ December 26, 2025 Anand Gupta 0