Petition of the CERC (Terms and Condition of Tariff) Regulations for installation of various Emission Control Systems in Bokaro-A Thermal Power Station (1×500 MW) – EQ
Petition of the CERC (Terms and Condition of Tariff) Regulations for installation of various Emission Control Systems in Bokaro-A Thermal Power Station (1×500 MW)
For more information please see below link:


