  3. BANDR issue Tender for Carrying out Topographical Survey for establishment of 300 MW Solar PV plant in connection with BOS Package for Development of 1200 MW – EQ
BANDR issue Tender for Carrying out Topographical Survey for establishment of 300 MW Solar PV plant in connection with BOS Package for Development of 1200 MW – EQ

BANDR issue Tender for Carrying out Topographical Survey for establishment of 300 MW Solar PV plant in connection with BOS Package for Development of 1200 MW – EQ

0
0

Summary:

* **Tender Details:**

* **NIT No.:** BANDR/NTPC/61042/TOPO/NIT/SC/02
* **Date:** 20.09.2025
* **Issued by:** Bridge & Roof Co. (India) Ltd., Kolkata
* **Owner:** NTPC Renewable Energy Ltd.

* **Scope of Work:**

* Conduct **Topographical Survey** of **Plot-10 and Plot-11** for setting up **300 MW Solar PV plant in each block**.
* Part of **Balance of System (BOS) package** for **1200 MW (4×300 MW) ISTS-connected Solar PV Projects** at **NTPC REL Khavda RE Park-South Block, Rann of Kutchh, Gujarat**.

* **Key Dates:**

* **Submission Deadline:** 26.09.2025 (Hardcopy only).
* **Tender Validity:** 30 days from submission.
* **Completion Period:** 1 month from LOI.

* **Financials:**

* **Tender Fee:** ₹1,180 (including GST).
* **EMD (Earnest Money Deposit):** ₹15,000.
* Exemption for registered DGS\&D/MSME/NSIC/SSIC bidders in Civil/Work Contract Services.

* **Qualification Criteria:**

* Experience in **topographical survey work** related to solar/energy/oil & gas sector.
* Minimum work value in last 7 years:

* One project ≥ ₹24 Lakhs, OR
* Two projects ≥ ₹15 Lakhs each, OR
* Three projects ≥ ₹12 Lakhs each.
* **Financial turnover:** ≥ ₹9 Lakhs (average over last 3 years, up to FY 2024–25).

* **Submission Requirements:**

* Two-part bid:

* **Part I:** Tender Fee + EMD + Techno-commercial documents.
* **Part II:** Price bid.
* Documents: PAN, GST registration with GSTR-3B, PF/ESI registration, ITR (last 3 years), completion certificates, site organogram, no deviation certificate, etc.
* JV/Consortium not allowed.

* **Other Conditions:**

* Company reserves right to split work, reject bids, or foreclose contract.
* Standard GCC/SCC apply (labour laws, safety, materials, liability, completion certificate, defects liability, termination clauses, etc.).
* Payment terms and schedules as per Appendix III.

—-

For more information please see below link: