### **1. PETITION DETAILS**
– **Petitioner:** BSES Rajdhani Power Ltd.
– **Legal Basis:** Filed under **Sections 86(1)(c), 86(1)(e), and 86(1)(k)** of the Electricity Act, 2003, read with:
– **Regulation 14** of the DERC (Net Metering for Renewable Energy) Regulations, 2014.
– **DERC (Peer-to-Peer Energy Transaction) Guidelines 2024.**
– **Nature:** Petition concerning a **pilot project** related to net metering and/or peer-to-peer energy transactions.
—
### **2. HEARING & COMMISSION’S ORDER**
1. **Petition Admitted:** The Commission has **admitted the petition** for the pilot project.
2. **Jurisdictional Issue:** The Commission raised a question regarding its **jurisdiction over interstate transactions** (referenced in **Prayer C** of the petition).
3. **Additional Submissions:** The Petitioner’s Senior Counsel requested time to make additional submissions. The Commission directed:
– Petitioner to make **additional submissions by 27.01.2026** on the jurisdictional aspect.
– DERC officers may seek **additional clarifications** from the Petitioner in the meantime.
4. **Next Hearing:** Listed for **27.01.2026**.
—
### **3. KEY IMPLICATIONS**
– The **pilot project petition is admitted**, but its scope—particularly concerning **interstate energy transactions**—remains subject to jurisdictional determination.
– The Commission’s final decision will depend on the **additional legal submissions** to be filed by the Petitioner.
– The case highlights the evolving regulatory landscape for **peer-to-peer energy trading** and **cross-state electricity transactions**.
—
For more information please see below link:
Related posts:
- Petition for Adoption of Tariff for the ISTS Grid connected 1400 MW Renewable Energy Power Projects coupled with Energy Storage System – EQ
- Petition of the CERC (Conduct of Business) Regulations of RE Power Developers for Supply of 1500 MW Firm and Dispatchable Power from ISTS-Connected Renewable Energy Power Projects – EQ
- Petition of GERC (Net Metering Rooftop Solar PV Grid Interactive Systems) Regulations installing rooftop solar PV Plants under PM Surya Ghar Muft Bijli Yojana – EQ
- Draft DERC (Group Net Metering and Virtual Net Metering for Renewable Energy) (Seventh Amendment) Guidelines, 2025 – EQ