1. Home
  2. Anand Gupta

Anand Gupta

Editor - EQ Int'l Media Network

Petition for determination of the Transmission Tariff for the Transmission Assets under Transmission System Strengthening Scheme for evacuation of power from Solar Energy Zones in RJ – EQ

Summary: — ### **1. Case Details** – **Petition No.**: 80/TT/2025 – **Subject**: Determination of **Transmission Tariff** for assets under the **Transmission System Strengthening Scheme for evacuation of power from Solar Energy Zones in Rajasthan (8.1 GW) under Phase-II-Part B1**. – **Petitioner**: **Power Grid Corporation of India Limited (PGCIL)** – **Respondents**: **Ajmer Vidyut Vitran Nigam Limited […]

Gujarat Green Hydrogen Project Policy 2025 – EQ

Summary: — ### **1. Policy Overview** – **Title**: Gujarat Green Hydrogen Policy – 2025 – **Operative Period**: From notification until **December 31, 2035**, or until a new policy is announced. – **Vision**: Drive sustainable growth, enhance energy security, enable production, consumption, and export of green hydrogen and its derivatives. – **Mission**: Achieve **3 MMTPA (Million […]

Final Renewable Energy Gujarat Policy 2025 – EQ

Sumamry: — ### **1. Policy Overview** – **Title**: Gujarat Integrated Renewable Energy Policy 2025 – **Operative Period**: From notification date until **December 31, 2030**, or until a new policy is notified. – **Vision**: Energy independence, affordable renewable power, socio-economic growth, decarbonization, and contribution to India’s energy transition. – **Mission**: Achieve **100+ GW of RE capacity** […]

MES issue Tender for Provn of Roof Top Solar Plants at Bathinda, Faridkot, Lalgarh Jattan, Abohar and Fazilka – EQ

Summary: — ### **1. PROJECT OVERVIEW** – **Work:** Provision of rooftop solar plants at **Bathinda, Faridkot, Lalgadh Jattan, Abohar, and Fazilka**. – **Estimated Cost:** ₹387.00 Lakhs (At Par Market). – **Contract Period:** – **Phase-I:** 6 months (execution). – **Phase-II:** 120 months (maintenance). – **Total:** 126 calendar months (10.5 years). – **Type of Contract:** Based on […]

TIFR issue Tender for DSITC of On-grid rooftop solar power plant at the main building terrace – EQ

Summary: — ### **1. PROJECT OVERVIEW** – **Project:** 177kWp rooftop solar power plant on the main building terrace at HBCSE-TIFR, Mankhurd, Mumbai. – **Estimated Cost:** ₹76,11,000 (including 8.9% GST). – **Tender System:** Two-part (Technical Bid + Financial Bid). – **Contract Period:** 6 months from the date of Work Order. – **Bid Due Date:** December 29, […]

Uninterrupted Power Supply Benefits 1.25 Lakh Households in Srinagar, Says CM Abdullah – EQ

In Short : Jammu and Kashmir Chief Minister Abdullah has said that uninterrupted electricity supply is now benefitting around 1.25 lakh households in Srinagar. The improved power availability reflects infrastructure upgrades and better management, enhancing daily life, economic activity, and public services while strengthening energy reliability in the region. In Detail : Chief Minister Abdullah […]

No Final Decision Taken on Power Sector Privatisation, Says UP Energy Minister – EQ

In Short : Uttar Pradesh’s energy minister has clarified that no final decision has been taken on the privatisation of the state’s power sector. The statement comes amid ongoing discussions on reforms aimed at improving efficiency, reducing losses, and strengthening service delivery, while ensuring consumer interests and energy security remain protected. In Detail : The […]

Lower, Fixed Transaction Fee Structure for Power Exchanges Under Consideration – EQ

In Short : A move to introduce lower, fixed transaction fees for power exchanges is under consideration to improve transparency and reduce costs for market participants. The proposed change aims to make power trading more efficient, enhance liquidity, encourage wider participation, and support the evolution of India’s competitive electricity markets. In Detail : Power market […]

Saatvik Green Energy Receives ₹13.5 Crore Solar Pump Order from MSEDCL – EQ

In Short : Saatvik Green Energy has secured a ₹13.5 crore order from Maharashtra State Electricity Distribution Company Limited (MSEDCL) for the supply of solar pumps. The order strengthens the company’s presence in the government-led solarisation of agriculture, supporting energy access for farmers while advancing India’s renewable energy and water sustainability objectives. In Detail : […]

Juniper Green Energy Commissions 60 MWh of 100 MWh Merchant BESS Project in Rajasthan – EQ

In Short : Juniper Green Energy has commissioned 60 MWh of its planned 100 MWh merchant battery energy storage system project in Rajasthan. The milestone strengthens grid flexibility, supports renewable energy integration, and marks a significant step in India’s emerging standalone energy storage market, enhancing reliability and dispatchability of clean power. In Detail : Juniper […]