Biannual Job contract for O AND M of 452.92KWp Grid-tied Rooftop SolarPV Power plant at NTPC Vindhachal stage-5
43
0
Biannual Job contract for O AND M of 452.92KWp Grid-tied Rooftop SolarPV Power plant at NTPC Vindhachal stage-5
For more information please see below link:
Related posts:
- Provision of 10 x Solar light lamp post for Medli Basti, District Karimganj (Assam)
- Notice Inviting Pre-Bid Offer for Supply, Installation, Commissioning and Maintenance of Satellite based Broadband Network and Solar power equipment
- Turnkey with CMC for total 60kWp PV Solar Roof Top System at Jalna MH
- Design, supply and procurement of 20 KW capacity solar rooftop system