Petition of the Electricity Act for determination of tariff of 15 MW Solar PV Grid connected Power Projects located at Vithalpar, District Morbi – EQ

Summary: — ## **Gujarat State Electricity Corporation Limited (GSECL) vs. Gujarat Urja Vikas Nigam Limited (GUVNL)** **Forum:** Gujarat Electricity Regulatory Commission (GERC), Gandhinagar **Petition No.:** 2508 of 2025 **Order Date:** 08 August 2025 **Coram:** * Mehul M. Gandhi, Member * S.R. Pandey, Member — ### **1. Case Background** * **Petitioner:** Gujarat State Electricity Corporation Limited […]

Petition of MSEDCL for long term procurement of 2500 MW RTC Power with the MoP’s RE RTC guidelines – EQ

Petition of the Electricity Act for determination of tariff of 40 MW Solar PV Grid connected Power Projects located at Haripar, District Jamnagar – EQ

Summary: — ## **Gujarat State Electricity Corporation Limited (GSECL) vs. Gujarat Urja Vikas Nigam Limited (GUVNL)** **Forum:** Gujarat Electricity Regulatory Commission (GERC), Gandhinagar **Petition No.:** 2511 of 2025 **Order Date:** 08 August 2025 **Coram:** * S.R. Pandey, Member * Mehul M. Gandhi, Member — ### **1. Case Background** * **Petitioner:** Gujarat State Electricity Corporation Limited […]

Petition of MSEDCL for long term procurement of 2500 MW RTC Power with the MoP’s RE RTC guidelines – EQ

Petition of the Electricity Act for determination of tariff of 30 MW Solar PV Grid connected Power Projects at Chandarava, District Botad – EQ

Summary: — ## **GUVNL vs. Essar Power Gujarat Limited** **Forum:** Gujarat Electricity Regulatory Commission (GERC), Gandhinagar **Petition No.:** 2496 of 2025 **Order Date:** 05 August 2025 **Coram:** * S.R. Pandey, Member * Mehul M. Gandhi, Member — ### **1. Case Background** * **Petitioner:** Gujarat Urja Vikas Nigam Limited (GUVNL) * Represented by Adv. Mr. Utkarsh […]

Petition of MSEDCL for long term procurement of 2500 MW RTC Power with the MoP’s RE RTC guidelines – EQ

In the matter of Grid Interactive Rooftop PV solar Project commissioned of GERC Net Metering Regulations – EQ

Summary: — ## **Case Summary** **Forum:** Gujarat Electricity Regulatory Commission (GERC), Gandhinagar **Petition No.:** 2466 of 2025 **Date of Order:** 21 July 2025 — ### **Parties** * **Petitioner:** Surya Roshni Ltd. *Represented by:* Mr. Kalpesh B. Ramjiyani & Mr. P.R. Thukral * **Respondent No. 1:** Paschim Gujarat Vij Company Ltd. (PGVCL) *Counsel:* Adv. Ms. Shrishty […]

Petition of MSEDCL for long term procurement of 2500 MW RTC Power with the MoP’s RE RTC guidelines – EQ

Petition for Adoption of tariff of Procurement of Storage Capacity from 250 MW/500 MWh Standalone Battery Energy Storage Systems – EQ

Summary: — ## **Case Summary** **Forum:** Gujarat Electricity Regulatory Commission (GERC), Gandhinagar **Petition No.:** 2371 of 2024 **Date of Order:** 17 July 2025 — ### **Parties** * **Petitioner:** Gujarat Urja Vikas Nigam Limited (GUVNL) *Represented by:* Mr. Nagajan H. Parmar & Mr. Sumit D. Harwani * **Respondent:** M/s Gensol Engineering Limited *Representation:* None present — […]

Petition of MSEDCL for long term procurement of 2500 MW RTC Power with the MoP’s RE RTC guidelines – EQ

In the matter of the GERC (Electricity Supply Code and Related Matters) and (Conduct of Business) Regulations for availing 7000 KVA Contract Demand and Consequential Directions – EQ

Summary: — ## **Case Summary** **Forum:** Gujarat Electricity Regulatory Commission (GERC), Gandhinagar **Petition No.:** 2342 of 2024 **Date of Order:** 19 July 2025 — ### **Parties** * **Petitioner:** Hindalco Industries Ltd., setting up a greenfield copper manufacturing facility at Waghodia, GIDC, Vadodara, Gujarat. *Counsel:* Adv. Kaustubha Mishra with Adv. Krishna Patel, Mr. Rohit Dongre, and […]

Petition of MSEDCL for long term procurement of 2500 MW RTC Power with the MoP’s RE RTC guidelines – EQ

In the matter of CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to Banaskantha Transco Limited – EQ

Summary: — ## 📘 **Case Overview** * **Petitioner:** Banaskantha Transco Limited * Now known as **POWERGRID Banaskantha Augmentation Transmission Limited** * A **100% subsidiary** of **Power Grid Corporation of India Ltd. (PGCIL)** * **Filed Under:** * **Sections 14 & 15** of the **Electricity Act, 2003** * Along with the **CERC (Transmission Licence) Regulations, 2024** * […]

Petition of MSEDCL for long term procurement of 2500 MW RTC Power with the MoP’s RE RTC guidelines – EQ

Petition for GERC (Procurement of Energy from Renewable Energy Sources) Regulations for CPP units of ONGC in Gujarat – EQ

Summary: — ## 📘 **Case Overview** * **Petitioner:** Oil & Natural Gas Corporation Ltd. (ONGC) * **Legal Counsel:** Mr. Akshat Khare, Advocate * **Objectors:** 1. **Reliance Industries Ltd.** — Represented by Ms. Amrita Thakore & Mr. Anant Kapse 2. **National Solar Energy Federation of India (NSEFI)** — *Not present* 3. **Utility Users’ Welfare Association** — […]

Petition of MSEDCL for long term procurement of 2500 MW RTC Power with the MoP’s RE RTC guidelines – EQ

Petition with GERC (Procurement of Energy from Renewable Sources) Regulations for Renewable Power Purchase Obligation – EQ

Summary: — ## 📘 **Case Overview** * **Petitioner:** Oil & Natural Gas Corporation Limited (ONGC) * **Objector:** Indian Wind Power Association (IWPA) — *No representation present* * **Legal Counsel for Petitioner:** Mr. Akshat Khare, Advocate * **Date of Order:** 23rd July 2025 * **Commission Bench:** * Mr. S. R. Pandey, Member * Mr. Mehul M. […]

Petition of MSEDCL for long term procurement of 2500 MW RTC Power with the MoP’s RE RTC guidelines – EQ

Petition of the CERC (Connectivity and General Network Access to the Inter-State Transmission System) Regulations, 2022 – EQ

Summary: — ## ⚖️ **Petition Summary** * **Petition No.**: 657/MP/2025 * **Filed By**: JSW Renew Energy Five Limited (JREFL) * **Respondents**: Central Transmission Utility of India Ltd. (CTUIL) and others * **Date of Hearing**: 17 July 2025 * **Forum**: CERC, New Delhi — ## 📌 **Legal Basis** * **Filed under**: * Section **79(1)(c)** and **79(1)(f)** […]

Petition of MSEDCL for long term procurement of 2500 MW RTC Power with the MoP’s RE RTC guidelines – EQ