Featured January 12, 2022 Anand Gupta 0 IMPORTANT: Pre-bid meeting for RfS for 1200 MW ISTS-connected Wind Power Projects (Tranche-XIII) – EQ Mag Pro 0 0 0 00 0 0 more IMPORTANT: Pre-bid meeting for RfS for 1200 MW ISTS-connected Wind Power Projects (Tranche-XIII) – EQ Mag Pro January 12, 2022 Anand Gupta now playing Solex Energy Limited Partners with Malaysia’s TT Vision to Advance Next-Gen Solar Automation and Talent Development in India - EQ January 12, 2022 Anand Gupta now playing Draft Procedure for Approval of Change in Renewable Energy Source(s) for Projects with Granted Connectivity - EQ January 12, 2022 Anand Gupta now playing Notice regarding Delay in Installation of SCADA based remote control system at IAF airfields - EQ January 12, 2022 Anand Gupta now playing Advancing Global Energy Collaboration: Sineng Electric Engages with CEEC International Delegation - EQ January 12, 2022 Anand Gupta now playing SJVN Ltd issue Tender for RfS Document for Selection of PSP Developers for Setting up of 2000 MW ESC from PSPP in India under Tariff-based Competitive Bidding - EQ January 12, 2022 Anand Gupta now playing Meeting on root cause analysis of slow progress of ISTS projects for FY 2025-26- reg. - EQ January 12, 2022 Anand Gupta now playing Petition with CERC (Procedure, Terms and Conditions for grant of Transmission Licence and other related matters) Regulations to Mandsaur I RE Transmission Limited - EQ January 12, 2022 Anand Gupta now playing Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for Gazuwaka under “Gazuwaka HVDC back to back project” in the Southern Region - EQ January 12, 2022 Anand Gupta now playing Petition for Truing up and the determination of transmission tariff for Palatana-Bongaigaon Transmission System Project in the North Eastern Region - EQ January 12, 2022 Anand Gupta now playing REIL issue Tender for Rate Contract for SDS of BOS Except SPV Modules ETC and Comprehensive O&M For 5 Years of 5 MW Grid Connected RSPVP on State Govt Buildings in UT - EQ January 12, 2022 Anand Gupta With reference to the RfS issued for selection of Wind Power Developers for Setting up of 1200 MW ISTS-connected Wind Power Projects in India under Tariff-Based Competitive Bidding (Tranche-XIII), the pre-bid meeting has been scheduled on 21.01.2022, at 02:30 PM (IST). The meeting will be conducted through video-conferencing on the Microsoft Teams Platform. Invitations for the meeting will be sent out on 20.01.2022. Prospective bidders interested to participate in the meeting may intimate the names and email ids of respective participants, by mailing to swapnil.gandhi@seci.co.in and jayansh.gaur@seci.co.in, latest by 19.01.2022. SECI may limit the number of participants from each organization to 2 (two), in view of limitations on the Teams platform. Related posts: SECI defers bids submission for 1,200 MW wind-solar hybrid capacities till May 7 Selection of 1200 MW ISTS-connected Wind-Solar Hybrid Power Projects (Tranche-II) Selection of 1200 MW ISTS-connected Solar PV Power Projects (ISTS-VI) SECI Tenders For 1200 MW RE Projects With Peak Power Supply tags: 1200 MW Pre-Bid Meeting SECI Wind Power Projects (Tranche-XIII) 0 00 0 0 previous Toshiba Launches 20Ah-HP SCiBTM Lithium-ion Rechargeable Battery Cell that Delivers Both High Energy and High Power - EQ Mag Pro next Green mobility: IREDA launches scheme to finance battery storage, green hydrogen and fuel cell technologies - EQ Mag Pro Anand Gupta Editor - EQ Int'l Media Network Related Posts Solex Energy Limited Partners with Malaysia’s TT Vision to Advance Next-Gen Solar Automation and Talent Development in India – EQ December 15, 2025 Anand Gupta 0 Draft Procedure for Approval of Change in Renewable Energy Source(s) for Projects with Granted Connectivity – EQ December 15, 2025 Anand Gupta 0 Notice regarding Delay in Installation of SCADA based remote control system at IAF airfields – EQ December 12, 2025 Anand Gupta 0