Featured January 12, 2022 Anand Gupta 0 IMPORTANT: Pre-bid meeting for RfS for 1200 MW ISTS-connected Wind Power Projects (Tranche-XIII) – EQ Mag Pro 0 0 0 00 0 0 more IMPORTANT: Pre-bid meeting for RfS for 1200 MW ISTS-connected Wind Power Projects (Tranche-XIII) – EQ Mag Pro January 12, 2022 Anand Gupta now playing Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time - EQ January 12, 2022 Anand Gupta now playing Petition for Truing up and determination of the transmission tariff for Combined Asset under “North Eastern Region Strengthening Scheme-IV” in the North Eastern Region - EQ January 12, 2022 Anand Gupta now playing Petition for determination of the Transmission Tariff for the Transmission Assets under Transmission System Strengthening Scheme for evacuation of power from Solar Energy Zones in RJ - EQ January 12, 2022 Anand Gupta now playing Gujarat Green Hydrogen Project Policy 2025 - EQ January 12, 2022 Anand Gupta now playing Final Renewable Energy Gujarat Policy 2025 - EQ January 12, 2022 Anand Gupta now playing MES issue Tender for Provn of Roof Top Solar Plants at Bathinda, Faridkot, Lalgarh Jattan, Abohar and Fazilka - EQ January 12, 2022 Anand Gupta now playing TIFR issue Tender for DSITC of On-grid rooftop solar power plant at the main building terrace - EQ January 12, 2022 Anand Gupta now playing Uninterrupted Power Supply Benefits 1.25 Lakh Households in Srinagar, Says CM Abdullah - EQ January 12, 2022 Anand Gupta now playing No Final Decision Taken on Power Sector Privatisation, Says UP Energy Minister - EQ January 12, 2022 Anand Gupta now playing Lower, Fixed Transaction Fee Structure for Power Exchanges Under Consideration - EQ January 12, 2022 Anand Gupta With reference to the RfS issued for selection of Wind Power Developers for Setting up of 1200 MW ISTS-connected Wind Power Projects in India under Tariff-Based Competitive Bidding (Tranche-XIII), the pre-bid meeting has been scheduled on 21.01.2022, at 02:30 PM (IST). The meeting will be conducted through video-conferencing on the Microsoft Teams Platform. Invitations for the meeting will be sent out on 20.01.2022. Prospective bidders interested to participate in the meeting may intimate the names and email ids of respective participants, by mailing to swapnil.gandhi@seci.co.in and jayansh.gaur@seci.co.in, latest by 19.01.2022. SECI may limit the number of participants from each organization to 2 (two), in view of limitations on the Teams platform. Related posts: SECI defers bids submission for 1,200 MW wind-solar hybrid capacities till May 7 Selection of 1200 MW ISTS-connected Wind-Solar Hybrid Power Projects (Tranche-II) Selection of 1200 MW ISTS-connected Solar PV Power Projects (ISTS-VI) SECI Tenders For 1200 MW RE Projects With Peak Power Supply tags: 1200 MW Pre-Bid Meeting SECI Wind Power Projects (Tranche-XIII) 0 00 0 0 previous Toshiba Launches 20Ah-HP SCiBTM Lithium-ion Rechargeable Battery Cell that Delivers Both High Energy and High Power - EQ Mag Pro next Green mobility: IREDA launches scheme to finance battery storage, green hydrogen and fuel cell technologies - EQ Mag Pro Anand Gupta Editor - EQ Int'l Media Network Related Posts Gujarat Green Hydrogen Project Policy 2025 – EQ December 25, 2025 Anand Gupta 0 Final Renewable Energy Gujarat Policy 2025 – EQ December 25, 2025 Anand Gupta 0 Government Driving National Green Hydrogen Mission Forward with Whole-of-Government Coordination – EQ December 25, 2025 Anand Gupta 0