Featured January 12, 2022 Anand Gupta 0 IMPORTANT: Pre-bid meeting for RfS for 1200 MW ISTS-connected Wind Power Projects (Tranche-XIII) – EQ Mag Pro 0 0 0 00 0 0 more IMPORTANT: Pre-bid meeting for RfS for 1200 MW ISTS-connected Wind Power Projects (Tranche-XIII) – EQ Mag Pro January 12, 2022 Anand Gupta now playing In the matter of the DERC Comprehensive (Code of Conduct) Regulations, 2001 - EQ January 12, 2022 Anand Gupta now playing In the matter of Approval of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) “Transmission System for connectivity of Essar Power Gujarat Limited” in the Western Region - EQ January 12, 2022 Anand Gupta now playing Petition of CERC (Connectivity and General Network Access to the Inter-State Transmission System) Regulations for connectivity has been granted of SUCRL - EQ January 12, 2022 Anand Gupta now playing SECI issue Tender for RfS for assured Peak Supply of 1500 MWh (500 MW x 3 Hrs.) under CfD Mechanism from ISTS-Connected RE Projects (SECI-CfD-I) - EQ January 12, 2022 Anand Gupta now playing MES issue Tender for Provn of Solar Power Plant of at Fort William Under GE(FW) Kolkata - EQ January 12, 2022 Anand Gupta now playing India’s Power Demand Surges Early in Summer as Heatwave Drives Record Consumption - EQ January 12, 2022 Anand Gupta now playing India Weighs Revisions to Battery Storage Import Benefits Amid Industry Concerns - EQ January 12, 2022 Anand Gupta now playing India’s Renewable Energy Expansion Set to Accelerate to 359 GW by FY30 - EQ January 12, 2022 Anand Gupta now playing China Strengthens Global Clean Energy Leadership as Export Demand Accelerates - EQ January 12, 2022 Anand Gupta now playing BHEL Delivers Strong FY26 Performance with 18% Revenue Growth and Robust Order Pipeline - EQ January 12, 2022 Anand Gupta With reference to the RfS issued for selection of Wind Power Developers for Setting up of 1200 MW ISTS-connected Wind Power Projects in India under Tariff-Based Competitive Bidding (Tranche-XIII), the pre-bid meeting has been scheduled on 21.01.2022, at 02:30 PM (IST). The meeting will be conducted through video-conferencing on the Microsoft Teams Platform. Invitations for the meeting will be sent out on 20.01.2022. Prospective bidders interested to participate in the meeting may intimate the names and email ids of respective participants, by mailing to swapnil.gandhi@seci.co.in and jayansh.gaur@seci.co.in, latest by 19.01.2022. SECI may limit the number of participants from each organization to 2 (two), in view of limitations on the Teams platform. Related posts: SECI defers bids submission for 1,200 MW wind-solar hybrid capacities till May 7 Selection of 1200 MW ISTS-connected Wind-Solar Hybrid Power Projects (Tranche-II) Selection of 1200 MW ISTS-connected Solar PV Power Projects (ISTS-VI) SECI Tenders For 1200 MW RE Projects With Peak Power Supply tags: 1200 MW Pre-Bid Meeting SECI Wind Power Projects (Tranche-XIII) 0 00 0 0 previous Toshiba Launches 20Ah-HP SCiBTM Lithium-ion Rechargeable Battery Cell that Delivers Both High Energy and High Power - EQ Mag Pro next Green mobility: IREDA launches scheme to finance battery storage, green hydrogen and fuel cell technologies - EQ Mag Pro Anand Gupta Editor - EQ Int'l Media Network Related Posts Pre-bid meeting: RfP for Supply of 80 MW Power on Short-Term Basis through Tariff-Based Competitive Bidding – EQ April 20, 2026 Anand Gupta 0 ADB President Calls for Collective Resilience Amid Economic Uncertainty – EQ April 20, 2026 Anand Gupta 0 COIMBATORE- THE SOLAR CAPITAL OF SOUTH INDIA- Driving India’s Clean Energy Growth – EQ April 20, 2026 Anand Gupta 0