Featured March 15, 2023 Anand Gupta 0 Manual on Transmission Planning Criteria 2023 – EQ Mag 0 0 0 00 0 0 more now viewing Manual on Transmission Planning Criteria 2023 – EQ Mag March 15, 2023 Anand Gupta now playing In the matter of Seeking exemption from having dedicated feeder for availing open access for Solar PV power of CSERC (Connectivity and Intra-State Open Access) Regulations - EQ March 15, 2023 Anand Gupta now playing Chhattisgarh's Solar Shift: State Commission Unlocks Green Power for Industry with Landmark Open Access Waiver - EQ March 15, 2023 Anand Gupta now playing CSERC (Terms and conditions for determination of tariff for Renewable Energy sources) Regulations, 2025 - EQ March 15, 2023 Anand Gupta now playing CSERC (Terms and Conditions for determination of Multi-Year Tariff) Regulations, 2025 - EQ March 15, 2023 Anand Gupta now playing Draft CSERC (Terms and Conditions for determination of Multi-Year Tariff) Regulations, 2025 - EQ March 15, 2023 Anand Gupta now playing Department of Fertilisers issue Tender for Purchase of Renewable Energy Certificates (RECs) for the year 2024-25 for NFL Bathinda in bilateral mode - EQ March 15, 2023 Anand Gupta now playing MES issue Tender for Provn of Roof Top Solar Project at Guwahati Under GE Guwahati - EQ March 15, 2023 Anand Gupta now playing CEL issue Tender for DES of BoS with Solar PV Modules Procurement I&C of 2.70 MW AC Solar PV grid connected power plant at DRDO Bangalore Karnataka - EQ March 15, 2023 Anand Gupta now playing Sukhu Sets Target to Meet Over 90% of Energy Requirement Through Renewable Sources - EQ March 15, 2023 Anand Gupta now playing Smart Metering and Smart Grids Are Driving Improvements in the Distribution Sector, Says Official - EQ March 15, 2023 Anand Gupta Manual on Transmission Planning Criteria 2023. For more information please see below link: Download [1.10 MB] Download [189.75 KB] Download [440.91 KB] Related posts: NATIONAL ELECTRICITY PLAN – EQ Mag Pro NATIONAL ELECTRICITY PLAN(Draft) Generation Vol- I – EQ Mag CEA (Cyber Security in Power Sector) Guidelines, 2021 – EQ Mag Pro ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS As on 31.01.2022 – EQ Mag Pro tags: CEA Government of India Manual on Transmission Planning Criteria 2023 0 00 0 0 previous RENEWABLE ENERGY AND STORAGE ISSUES - Installed capacity of Pumped Storage Projects (PSPs) in the country is 4745.6 MW and another 1500 MW capacity is under active construction - EQ Mag next The Netherlands Launched Anti-Nesting Fences to Prevent Birds from Approaching Solar Panels - EQ Mag Anand Gupta Editor - EQ Int'l Media Network Related Posts In the matter of Seeking exemption from having dedicated feeder for availing open access for Solar PV power of CSERC (Connectivity and Intra-State Open Access) Regulations – EQ December 23, 2025 Anand Gupta 0 Chhattisgarh’s Solar Shift: State Commission Unlocks Green Power for Industry with Landmark Open Access Waiver – EQ December 23, 2025 Anand Gupta 0 CAQM Reviews Air Pollution Control Measures, Ratifies Revised GRAP in 26th Commission Meeting – EQ December 23, 2025 Anand Gupta 0