## ๐Ÿ“Œ Case Overview

* **Petitioner:** NHPC Limited
* **Respondents:** Teerth Gopicon Ltd. & Ors.
* **Subject:** Petition under Section 63 of the Electricity Act, 2003 for **adoption of tariff** for **1200 MW ISTS-connected solar projects**, with additional capacity of **up to 1200 MW under Greenshoe Option**.
* **Date of Hearing:** 5th August 2025
* **Coram:** Chairperson Jishnu Barua & Members Ramesh Babu V., Harish Dudani, Ravinder Singh Dhillon.

## โšก Background

* NHPC conducted **Tariff-Based Competitive Bidding (TBCB)** under MoPโ€™s 2023 guidelines for 1200 MW solar projects.
* The bid also included a **Greenshoe Option**, allowing successful bidders to take on additional capacity (up to another 1200 MW).

## ๐Ÿ›๏ธ Submissions by Petitioner

* NHPC confirmed compliance with earlier CERC directions (RoP dated 24.06.2025) via affidavit (18.07.2025).
* On **Greenshoe Option**:

* Guidelines do not explicitly mention Greenshoe, but do not prohibit it either.
* Only a **minimum offtake** is prescribed, with no maximum cap โ†’ allowing flexibility.
* Referred to **meeting with MNRE Secretary (18.07.2024)** โ€“ REIA has flexibility to determine bid size under Standard Bidding Guidelines.
* CERC has previously **permitted Greenshoe allocations** in SECI-conducted bids.
* **Allocation process:**

* All successful bidders were first offered additional capacity equal to their original allocation.
* If declined, the unaccepted capacity was re-offered to other bidders at **L1 tariff rates**.

## โœ… Commissionโ€™s Directions

1. NHPC to file a **Rate Reasonability Certificate** on affidavit within **two weeks**.
2. Subject to this submission, **Order reserved**.