Petition for Adoption of tariff of Firm & Dispatchable Power under “Greenshoe Option” from ISTS connected RE Power Projects coupled with Energy Storage System – EQ

Summary: — 1. **Background & Procedural Update:** The Petitioner (NHPC) informed the Commission that notices were issued to all Respondents on February 26, 2026, allowing them to file replies. However, **none of the Respondents filed any reply.** 2. **Respondent’s Position:** The counsel for Respondent *ACME Solar Holdings Limited* explicitly **supported the Petition**. They confirmed that […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition for Approval of PPA and Adoption of tariff for procurement of RE-RTC power up to 8 MW for a period of 11 months – EQ

Summary: — ## 1. Case Overview | Parameter | Detail | |———–|——–| | **Case No.** | 251 of 2025 | | **Petitioners (Buyers)** | M/s Mindspace Business Parks Pvt Ltd (MBPPL)<br>M/s Gigaplex Estate Pvt Ltd (GEPL)<br>M/s KRC Infrastructure and Projects Pvt Ltd (KRCIPPL) | | **Respondent (Seller)** | M/s Energy Edge Power Trading Limited (Trader) […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition for approval of PPA and Adoption of tariff for procurement of 60 MW power for a period of 20 years from wind-solar hybrid power projects – EQ

Summary: — ## Key Facts of the Case | Parameter | Detail | |———–|——–| | **Petition filed on** | 18 July 2025 | | **Procurement volume** | 60 MW | | **Duration** | 20 years | | **Discovered tariff range** | ₹4.35 – ₹4.40/kWh | | **Bidding guidelines** | Ministry of Power’s “Guidelines for Tariff […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition for the Adoption of tariff for the supply of 1200 MW ISTS-Connected Solar PV Power Projects Anywhere in India with “Greenshoe Option” – EQ

Summary: — ## Key Business Information | Parameter | Detail | |———–|——–| | **Petitioner** | NTPC Limited | | **Total Tendered Capacity** | 1,200 MW | | **Greenshoe Option** | Up to 600 MW (not awarded) | | **Total Bids Received** | 1,020 MW from 6 bidders | | **Capacity Offered for Reverse Auction** | […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition for Adoption of tariff of 1200 MW Wind-solar hybrid power projects with Greenshoe option to connected the Inter-State Transmission System of the Ministry of Power, Government of India from time to time – EQ

Summary: — ## **Key Decisions by the Commission** ### **1. Tariff Adoption (Approved)** – The Commission **adopted the discovered tariffs** ranging from **₹3.35/kWh to ₹3.36/kWh** for the **1,200 MW** capacity. – **Reasoning:** The tariffs are lower than previously adopted tariffs for similar hybrid projects (₹3.43–₹3.46/kWh in Petition Nos. 268/AT/2024 and 402/AT/2024), reflecting competitive market conditions. […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition for Adoption of Tariff for the ISTS Grid connected Solar Power projects of 1200 MW with “Greenshoe Option” by Ministry of Power, Govt. of India (NHPC Tranche-IX) – EQ

Summary: —- ### **Key Findings & Decisions by the Commission** 1. **Tariff Adoption (Modified):** – The Commission **adopted the discovered tariffs** but **reduced the total capacity** from 2,170 MW to **1,670 MW**. – **Reasoning:** Concern over the “Greenshoe Option” process lacking explicit provisions in the central guidelines, raising issues of transparency and equal treatment of […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition for Adoption of tariff of 1500 MW Solar PV Power Projects Connected to the ISTS of the Ministry of Power, Government of India as amended from time to time – EQ

Summary: — ### 1. Background and Context – **Petitioner:** NTPC Limited. – **Prayer:** Adoption of tariff discovered through competitive bidding for 1500 MW ISTS-connected solar PV projects, and approval of a trading margin of **₹0.07/kWh**. – **Governing Framework:** – **Guidelines for Tariff-Based Competitive Bidding for Grid-Connected Solar PV Power Projects** (Ministry of Power, **July 28, […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ

Summary: — ### Green-Shoe Option Allocation NHPC offered an **additional 1,200 MW** under the Green-Shoe Option at the L1 tariff (₹3.41/kWh). The allocation proceeded as follows: | Round | Bidder | Allocation (MW) | |——-|——–|—————-| | **First Round** | Adani | 600 | | | Avaada | 210 | | | Sprng & Illuminate | […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition for Adoption of Tariff for setting up of 1200 MW ISTS Connected Wind-Solar Hybrid Power Projects (HYBRID-3) in India by the Ministry of Power – EQ

Summary: — #### 1. Project & Regulatory Overview – **Core Objective:** SJVN sought the adoption of tariffs discovered through a competitive bidding process for a large-scale wind-solar hybrid power project. This is a **post-bid, regulatory approval** step required under the Electricity Act, 2003. – **Project Scope:** 1200 MW of Inter-State Transmission System (ISTS)-connected Wind-Solar Hybrid […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition for Adoption of Tariff for Setting up of 1200 MW ISTS-connected Solar PV Power Projects with 600 MW/2400 MWh Energy Storage Systems anywhere in India – EQ

Summary: — #### 1. Project & Regulatory Overview – **Core Objective:** SJVN sought the adoption of tariffs discovered through a competitive bidding process for a large-scale renewable energy project. This is a **post-bid, regulatory approval** step required under the Electricity Act, 2003. – **Project Scope:** 1200 MW of Interstate Transmission System (ISTS)-connected Solar PV Power […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ