Petition for Approval of Procurement of Power by Distribution Licensees through Tariff of sufficient power during summer peak – EQ
Summary:
—
### **1. PETITION DETAILS**
– **Petitioner:** Tata Power Delhi Distribution Ltd.
– **Legal Basis:** Petition filed under **Section 63** and **Section 86(1)(b)** of the Electricity Act, 2003.
– **Purpose:**
– Approval for **procurement of power on a Short-Term Basis** through a **Tariff-Based Competitive Bidding Process**.
– Adoption of **discovered tariff** and approval of **draft Power Purchase Agreement (PPA)**.
– **Reason for Procurement:** To ensure sufficient power availability during the **summer peak period** from **16.05.2026 to 30.06.2026**.
– **Guidelines Followed:** Ministry of Power’s Guidelines for Short-Term Procurement of Power by Distribution Licensees (as amended).
—
### **2. HEARING & ORDER**
– **Bench:** Sh. Ram Naresh Singh (Member) and Sh. Surender Babbar (Member).
– **Representation:** Petitioner represented by Senior Advocate Buddy Ranganadhan and other counsels.
– **Proceedings:**
– Petition **admitted**.
– Commission may seek clarifications from the Petitioner, which must be provided.
– **Next Hearing Date:** Listed for **27.01.2026**.
—
### **3. KEY TAKEAWAYS**
– The Commission has **admitted the petition** for consideration.
– The case will proceed with possible clarifications and further hearing on **27.01.2026**.
– The outcome will determine whether Tata Power Delhi Distribution Ltd. can proceed with short-term power procurement via competitive bidding for the specified summer period.
—
For more information please see below link:
Related posts:
- Petition for Approval of procurement of power by Distribution Licensees, Adoption of tariff discovered under competitive bidding process and approval of draft PPA – EQ
- Petition for Tariff Framework for Procurement of Power by Distribution Licensees and Others from Wind Power Projects for the State of Gujarat at Jam jodhpur – EQ
- In the Matter of Tariff Framework for Procurement of Power by Distribution licensees and Others from Wind Power Projects for State of Gujarat – EQ
- Petition of Approval to procure and sign Power Sale Agreement of 150 MW assured peak power from SJVN Ltd. 6000 MWh Renewable Energy Project with Energy Storage – EQ