
Petition for determination of the Transmission Tariff from the COD under “Transmission System strengthening scheme for evacuation of power from solar energy zones in Rajasthan (8.1GW) under Phase-II-Part B1” – EQ
0
0
Petition for determination of the Transmission Tariff from the COD under “Transmission System strengthening scheme for evacuation of power from solar energy zones in Rajasthan (8.1GW) under Phase-II-Part B1”
For more information please see below link:
Related posts:
- Petition for Truing Up and determination of transmission tariff for the Transmission System associated for Nabinagar TPS in the Eastern Region – EQ
- Petition for Truing Up and determination of Transmission Tariff for Madurai-Trivandrum Transmission System in Southern Region – EQ
- Petition for Truing up and the determination of transmission tariff for the Madurai-Trivandrum Transmission System in the Southern Region – EQ
- Petition for Truing up and determination of transmission tariff for utilized as Bus Reactor at Jaipur (South) Sub-station and Asset- II at Kota and Jaipur (South) under Transmission System in Northern Region – EQ
tags:
CERC determination evacuation of power Phase-II-Part B1 Rajasthan (8.1GW) REGULATIONS solar energy zones strengthening scheme the COD Transmission System Transmission Tariff