Petition of Adoption of usage charges for 510 MW Solar PV Power Station (Tranche-III) connected to the Inter-State Transmission System as per the Standard Bidding Guidelines of MoP – EQ
0
0
Petition of Adoption of usage charges for 510 MW Solar PV Power Station (Tranche-III) connected to the Inter-State Transmission System as per the Standard Bidding Guidelines of MoP
For more information please see below link:
Related posts:
- Petition of Adoption of usage charges for 510 MW Solar PV Power Station (Tranche-III) connected to the Inter-State Transmission System under Central Power Sector – EQ
- Petition for the Adoption of tariff for 2000 MW inter-State Transmission System Solar PV Power Projects with Energy Storage System (SECI ISTS XVII) – EQ
- Petition for Adoption of tariff for 600 MW inter-state Transmission System connected Wind-Solar Hybrid Power Projects (SECI ISTS IX) – EQ
- Petition for the Adoption of tariff for 2000 MW inter-State Transmission System Solar PV Power Projects ESS (SECI ISTS XVII) – EQ
tags:
510 MW ADOPTION CERC inter state transmission system MOP Power Station Tranche-III SOLAR PV Standard Bidding Guidelines


