Petition of Adoption of usage charges for 510 MW Solar PV Power Station (Tranche-III) connected to the Inter-State Transmission System as per the Standard Bidding Guidelines of MoP – EQ
Petition of Adoption of usage charges for 510 MW Solar PV Power Station (Tranche-III) connected to the Inter-State Transmission System as per the Standard Bidding Guidelines of MoP
For more information please see below link:
tags:
510 MW ADOPTION CERC inter state transmission system MOP Power Station Tranche-III SOLAR PV Standard Bidding Guidelines
