## π **Case Details**
– **Petition No.**: 337/TT/2022
– **Petitioner**: Power Grid Corporation of India Limited (PGCIL)
– **Respondents**: Bihar State Power (Holding) Company Limited (BSPHCL) and Others
– **Date of Hearing**: 11.12.2025
– **Bench**: Shri Ramesh Babu V. (Member), Shri Harish Dudani (Member)
—
## π§Ύ **Subject of Petition**
PGCIL sought approval under **Regulation 86** of:
1. CERC (Conduct of Business) Regulations, 1999
2. CERC (Terms and Conditions of Tariff) Regulations, 2019
For determination of **transmission tariff from COD to 31.03.2024** for assets under:
> **βTransmission System for Transfer of Power from generation projects in Sikkim to NR/WR (Part β B1)β** in the Eastern Region.
—
## βοΈ **Key Issue Discussed**
– PGCIL submitted a **Corrigendum dated 29.10.2025** issued by the **Central Electricity Authority (CEA)**, correcting a **typographical error** in a 2016 CEA Certificate.
– The corrigendum confirms that the asset under tariff approval is for **LILO (Line-In Line-Out)**.
– **Respondents 7 & 8 (TPTL & TUL)** opposed the corrigendum, arguing:
– CEA issued the original Energisation Certificate in 2016.
– In 2018, CEA stated via RTI that it **did not inspect the loop-out portion** nor grant approval.
– They objected to CEA issuing a corrigendum **almost a decade after inspection**.
—
For more information please see below link:
Related posts:
- Petition for Truing-up and determination of transmission tariff for CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations, 2024 – EQ
- Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations under βTransmission System for controlling High Short Circuit Level at 400 kV Thiruvalam Substationβ in the Southern Region – EQ
- Petition for Truing up and determination of the transmission tariff of the CERC (Conduct of Business) ans (Terms and Conditions of Tariff) Regulations for Phase-II generation projects in Odishaβ in the Eastern region – EQ
- In the matter of Approval of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and determination of transmission tariff for βCombined asset under URI- II HEP Transmission Systemβ in the Northern Region – EQ