Petition of the CERC (Open Access in inter-State Transmission) Regulations for Standing Clearance for grant of Short Term Open Access for 19.2 MW capacity – EQ
0
0
Petition of the CERC (Open Access in inter-State Transmission) Regulations for Standing Clearance for grant of Short Term Open Access for 19.2 MW capacity
For more information please see below link:
Related posts:
- Petition of the CERC (Open Access in inter-State Transmission) Regulations, 2008 – EQ
- Petition of the CERC (Connectivity and Generation Network Access to the Inter-State Transmission System) and (Conduct of Business) Regulations – EQ
- Petition of the CERC (Grant of Connectivity, Long Term Access and Medium Term Open Access in inter State transmission and related matters) Regulations of long term access granted on the existing ISTS – EQ
- Petition of the CERC (Grant of Connectivity, Long-Term Access and Medium Term Open Access in inter-State transmission and related matters) Regulations to Stage II Connectivity – EQ
tags:
19.2 MW capacity CERC Inter-State OPEN ACCESS REGULATIONS SHORT-TERM Standing Clearance TRANSMISSION


