Summary: — ## **Key Business Implications** ### 1. **Liability for Transmission Charges Despite GNA Not Being Effective** | Generator Argument | CERC Ruling | |——————-|————–| | GNA not yet effective, so no transmission charges payable | **Rejected.** Liability under Regulation 13(3) of 2020 Sharing Regulations is linked to **ATS achieving COD**, not GNA effectiveness. | […]
In Short : Om Power Transmission witnessed a strong stock market debut as its shares climbed over 6% during initial trading. The positive listing reflects investor confidence in the company’s growth prospects, supported by rising demand in the power infrastructure sector and increasing investments in transmission and distribution networks across India’s expanding energy ecosystem. In […]
In Short : Expanding renewable energy capacity requires robust transmission infrastructure capable of handling variable power generation and long-distance electricity flow. Strengthening grids, deploying smart technologies, and building high-capacity corridors are essential to integrate solar and wind efficiently. Strategic planning, investment, and policy support will ensure reliability, reduce curtailment, and enable seamless delivery of clean […]
In Short : The Centre has constituted a high-level panel to oversee the proposed merger of Power Finance Corporation and REC Limited. The move aims to create a stronger, unified power sector financing entity capable of supporting India’s expanding renewable energy, transmission, and infrastructure needs while improving operational efficiency, capital allocation, and financial strength. In […]
In Short : REC has incorporated Vizag Power Transmission as a wholly owned subsidiary to develop transmission infrastructure for a green hydrogen project. The move reflects REC’s strategic focus on supporting India’s clean energy transition by enabling reliable power evacuation and connectivity for emerging green hydrogen ecosystems, particularly in the Visakhapatnam region. In Detail : […]
in Short : India added 26.8 GW of power this fiscal year, with 20.1 GW from renewables, but grid expansion lags significantly. Only 1,998 ckm of transmission lines were added against a 15,382 ckm target, stranding an estimated 50 GW of renewable capacity. Underutilized corridors and intermittent generation highlight the need for robust infrastructure. Accelerated grid development is critical to […]
Petition of the CERC (Open Access in inter-State Transmission) Regulations for Standing Clearance for grant of Short Term Open Access for 19.2 MW capacity For more information please see below link: